Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/5/2022 | Treatment End Date: | 1/5/2022 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH SOLVENT 43 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 90 | Max pressure during treatment (psi): | 2477 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 43 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/1/2020 | Treatment End Date: | 4/1/2020 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH SOLVENT 62 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 109 | Max pressure during treatment (psi): | 2485 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 62 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 3/20/2012 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL AT 0.9 BPM @ 1150 PSI END OF COILED TUBING @ 6036' |
Formation Treatment |
Treatment Date: | 11/18/2009 |
Treatment Summary: | ACID STIMULATION 11/18/09 PUMPED 4000 GALLONS OF 20% HCI AT 3.6 BPM AVERAGE PRESSURE 2750 PSI THROUGH TUBING AT 6202'. |