Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06268
Well Classification: ERIW Status: IJ - 3/6/2023
Well Name/No:UNION PACIFIC #35-32
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date3/6/2023
FacilityID:229183LocationID:311790
County:RIO BLANCO #103Location:SWSW 32 2N102W 6
Field:RANGELY - #72370Elevation:5271 ft.
Planned Location:660FSL  660 FWLLat/Long: 40.094036 / -108.874236Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.094096 / -108.874288Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 3/6/2023             Measured TD: 6443 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 3/6/2023
Wellbore Permit
Permit #:100001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/23/1979
Measured TD:6443 ft.Measured PB depth:6443 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: CONDUCTOR, Hole Size: 22 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 59.8 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 10.75 in., Top: 0 ft., Depth: 495 ft., Weight: 45.5 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 495 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 9 in., Size: 7 in., Top: 0 ft., Depth: 5744 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: , Bottom: 5744 ft., Determination Method:
Casing:String Type: OPEN HOLE, Hole Size: 9 in., Size: , Top: 5744 ft., Depth: 6433 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA1973 ft.
FRONTIER2858 ft.
MOWRY3128 ft.
DAKOTA3218 ft.
MORRISON3318 ft.
CURTIS3980 ft.
ENTRADA4084 ft.
CARMEL4242 ft.
NAVAJO4294 ft.
CHINLE4887 ft.
SHINARUMP5025 ft.
MOENKOPI5100 ft.

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 3/6/2023                  Interval Top: 5744 ft.    Interval Bottom: 6443 ft.

 Completed Information for Formation WEBER
1st Production Date:9/3/1991Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:8/14/2023Treatment End Date:N/A
Treatment Summary:THIS INJECTION WELL WAS SHUT IN 1/5/2022. WELLWORK TO CLEAN OUT, RAN LOCKSET PACKER, KS1X PACKER AND TUBING. RETURN WELL TO ACTIVE INJECTION PENDING AN APPROVED FORM 21.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/1/2023Treatment End Date:3/1/2023
Treatment Summary:Pumped 4000 gallons (95.2 bbl.) 15% HCL w/ additives and inhibitor and 45 bbl. fresh water. Converted to injection 09/03/1991
Total fluid used in treatment (bbls):140Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/4/2022Treatment End Date:1/4/2022
Treatment Summary:PUMPED 3000 GALLONS (71.4 BBLS) 15% HCL W/SOLVENT AND 45 BLS FRESH WATER
Total fluid used in treatment (bbls):116Max pressure during treatment (psi):2477
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):71Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/23/1979
Treatment Summary:ACID STIMULATION 2/20/06 PUMPED 3000 GALS 15% HCI THROUGH TUBING.
Tubing Size:2.875 in.Tubing Setting Depth:5597 ft.
Tubing Packer Depth:5499 ft.Tubing Multiple Packer:Y ft.
Open Hole Top:5744 ft.Open Hole Bottom:6443 ft.
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5744 ft.# Of Holes:
Interval Bottom:6443 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)9652
GOR
GOR DeterminationMCFE
Average BOE per Day4.518
Average MCFE per Day26.191

 Federal Financial Assurance  i 

 Tribal Well  i No