| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 4/24/2025 | Treatment End Date: | 4/24/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL w/SOLVENT AND 35 BBLS FRESH WATER. |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/25/2024 | Treatment End Date: | 3/25/2024 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 55 bbls fresh water |
| Total fluid used in treatment (bbls): | 102 | Max pressure during treatment (psi): | 2600 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 55 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/13/2022 | Treatment End Date: | 10/13/2022 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/mutual solvent and 35 bbls water. |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/8/2021 | Treatment End Date: | 3/8/2021 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/6% Citric acid and 42 bbls water |
| Total fluid used in treatment (bbls): | 89 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 42 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/25/2018 | Treatment End Date: | 10/22/2018 |
| Treatment Summary: | PUMPED 4000 GALLONS 15% HCL AT 0.6 BPM 2100 PSI WITH 130 BBLS WATER. |
| Total fluid used in treatment (bbls): | 225 | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 130 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 2/10/2017 | Treatment End Date: | 2/11/2017 |
| Treatment Summary: | Pumped 2000 gallons 15% HCl with 60 gallons MuSol solvent, 400 bbls fresh water.
|
| Total fluid used in treatment (bbls): | 449 | Max pressure during treatment (psi): | 2250 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 400 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 4/27/2011 |
| Treatment Summary: | ACID STIMULATION WITH 4000 GALLONS 20% HCL THROUGH END OF COILED TUBING @ 6024', .8 BPM @ 1300 PSI |
| Formation Treatment |
| Treatment Date: | 11/20/2009 |
| Treatment Summary: | ACID STIMULATION 11/20/09 PUMPED 3000 GALLONS 20% HCI THROUGH TUBING 5624.6 AVERAGE RATE 3.4 BPM 2624 PSI. |