| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 10/17/2025 | Treatment End Date: | N/A |
| Treatment Summary: | Rig work consisted of the following MIRU AESC Rig #1 & Aux equipment. Roll out pkr fluid w/ 240 bbls of fresh wtr. Release 7” PS1-X Pkr. Well, started to flow. Kill well w/ 10# brine. L/D F.L. Prod tbg. Fish out 5½” Loc-set Pkr. Kill well with 10.8# CaCl2 & up. C/O Scale, csg & FG from 5,763’ to 6,035’ old FT. Call C/O Good. RIH w/ Btm 5 ½” Loc-set Pkr. Set @ 5,514’. Have PLS set plug in profile. Test plug to 2,500 psi, good test. Roll out kill fluid. PU test pkr and set at old top pkr depth. Chart tested csg to 1,700 psi for 30 mins. Roll in pkr fluid. L/D 2 7/8” W.S. P/U 7” AS-1X pkr & 2 7/8” F.L. Prod tbg. Land well out in 14K of compression. N/D BOPS. N/U Injection Tree. Tested tbg to 2,500 psi for 5 mins, good. Pre-MIT test csg to 1,720 psi for 30 mins. 0 psi loss, good test. RDMO Rig. Job complete.
MIT scheduled for October 13, 2025, RTI pending approved Form 21. |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/18/2023 | Treatment End Date: | 12/18/2023 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL & Inhibitor and 35 bbls Fresh Water. |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2468 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/4/2019 | Treatment End Date: | 10/4/2019 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH SOLVENT AND 116 BBLS FRESH WATER. |
| Total fluid used in treatment (bbls): | 211 | Max pressure during treatment (psi): | 2100 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 116 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 3/9/2010 |
| Treatment Summary: | ACID STIMULATION 3/09/10 PUMPED 4000 GALLONS 20% HCI THROUGH TUBING AT 5647' STARTING AT .7 BPM @ 2500 PSI. |