Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06254
Well Classification: ERIW Status: IJ - 3/1/2013
Well Name/No:EMERALD #22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date3/1/2013
FacilityID:229169LocationID:314635
County:RIO BLANCO #103Location:SWNW 31 2N102W 6
Field:RANGELY - #72370Elevation:5328 ft.
Planned Location:1830FNL  660 FWLLat/Long: 40.101665 / -108.893136Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.101742 / -108.893085Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 3/1/2013             Measured TD: 6367 ft.    Vertical TD: 6367 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 3/1/2013
Wellbore Permit
Permit #:10001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:10/1/1984
Measured TD:6367 ft.Measured PB depth:0 ft.
True Vertical TD:6367 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 2380 ft., Weight: 45 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 2380 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5746 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 3100 ft., Bottom: 5746 ft., Determination Method:
Casing:String Type: OPEN HOLE, Hole Size: , Size: , Top: 5746 ft., Depth: 6367 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:

Formation WEBR                     Formation Classification:  DSPW                     Status:  IJ - 3/1/2013                  Interval Top: 5746 ft.    Interval Bottom: 6367 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/28/2013Treatment End Date:2/28/2013
Treatment Summary:ACID STIMULATION - 20% HCL AT 1 BPM @ 1200 PSI
Total fluid used in treatment (bbls):345Max pressure during treatment (psi):1200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):250Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6186 ft.
Tubing Packer Depth:5551 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5746 ft.# Of Holes:
Interval Bottom:6367 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)194243
GOR
GOR DeterminationMCFE
Average BOE per Day91.663
Average MCFE per Day531.630

 Federal Financial Assurance  i 

 Tribal Well  i No