| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/9/2025 | Treatment End Date: | 12/9/2025 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL w/solvent and 35 bbls fresh water. |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 9/14/2019 | Treatment End Date: | 9/14/2019 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID, 80 BBLS OF WATER. |
| Total fluid used in treatment (bbls): | 127 | Max pressure during treatment (psi): | 2260 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 3/22/2012 |
| Treatment Summary: | PUMPED 4000 GALLONS 15% HCL THROUGH COILED TUBING AT 5640' |
| Formation Treatment |
| Treatment Date: | 5/26/2006 |
| Treatment Summary: | ACID STIMULATION BY PUMPING 43000 GALS HEATED 15 PERCENT HCI THROUGH TUBING AT A DEPTH OF 5653 |