Formation Treatment |
Treatment Type: | |
Treatment Date: | 6/16/2020 | Treatment End Date: | N/A |
Treatment Summary: | PERFORATIONS 5568-5600, OPEN HOLE 5626-6386
TUBING PLUG SET AT 5540' ON 8/4/2016 |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/6/2014 | Treatment End Date: | N/A |
Treatment Summary: | Bullhead 4000 gallons 15% HCL at beginning 2460 psi. |
Total fluid used in treatment (bbls): | 285 | Max pressure during treatment (psi): | 2460 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 190 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/1/2014 | Treatment End Date: | 2/1/2014 |
Treatment Summary: | ACID STIMULATION
|
Total fluid used in treatment (bbls): | 175 | Max pressure during treatment (psi): | 2100 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 10/18/2011 |
Treatment Summary: | ACID STIMULATE WITH 4000 GALLONS 20% HCL THROUGH END OF COILED TUBING AT 6121' |
Formation Treatment |
Treatment Date: | 11/23/2010 |
Treatment Summary: | Actually: perfs from 5568 to 5600 - no. holes unknown - well completed in 1946
Open hole 5626 to 6386
DRILL OUT CEMENT PLUGS
NO STIMULATION WORK |