Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06223
Well Classification: ERIW Status: IJ - 12/12/2022
Well Name/No:FEE #40
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date12/12/2022
FacilityID:229140LocationID:314621
County:RIO BLANCO #103Location:NWSE 28 2N102W 6
Field:RANGELY - #72370Elevation:5282 ft.
Planned Location:1980FSL  1980 FELLat/Long: 40.112166 / -108.845735Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.112240 / -108.845680Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 12/12/2022             Measured TD: 6490 ft.    Vertical TD: 6490 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 12/12/2022
Wellbore Permit
Permit #:100001 Expiration Date:6/17/1981
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:7/16/1985
Measured TD:6490 ft.Measured PB depth:6484 ft.
True Vertical TD:6490 ft.True Vertical PB depth:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5726 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST LINER, Hole Size: 0 in., Size: 5 in., Top: 5532 ft., Depth: 6488 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 12/12/2022                Interval Top: 5732 ft.    Interval Bottom: 6422 ft.

 Completed Information for Formation WEBER
1st Production Date:7/24/1985Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/9/2022Treatment End Date:12/9/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 GALLONS) 15% HCL, W/MUTUAL SOLVENT AND 35 BBLS FRESH WATER.
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/29/2019Treatment End Date:11/29/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 GALLONS) 15% HCL, 6% CITRIC, MUSTOL AND 40 BBLS FRESH WATER.
Total fluid used in treatment (bbls):87Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/9/2017Treatment End Date:12/10/2017
Treatment Summary:PUMPED 4000 GALLONS 15% HCL AND 410 BBLS WATER WELL PLACED ON INJECTION 7/24/1985
Total fluid used in treatment (bbls):505Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):410Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/4/2017Treatment End Date:8/4/2017
Treatment Summary:PUMPED 4000 GALLONS 15% HCL WITH 80 BBLS WATER. WELL PLACED ON INJECTION 7/24/1985.
Total fluid used in treatment (bbls):175Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/7/2016Treatment End Date:10/7/2016
Treatment Summary:PUMPED 2000 GALLONS 15% HCL WITH 110 GALLONS P-444 SOLVENT, 200 BBLS FRESH WATER
Total fluid used in treatment (bbls):250Max pressure during treatment (psi):2472
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):200Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:2/3/2010
Treatment Summary:ACID STIMULATION 2/03/2010 PUMPED 4500 GALLONS OF 20% HCI ES THROUGH TUBING AT 6401' AVERAGE 3 BPM @ 2250 PSI.
Tubing Size:2.875 in.Tubing Setting Depth:6401 ft.
Tubing Packer Depth:5388 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5732 ft.# Of Holes:132
Interval Bottom:6422 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)171430
GOR
GOR DeterminationMCFE
Average BOE per Day81.131
Average MCFE per Day470.540

 Federal Financial Assurance  i 

 Tribal Well  i No