Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06220
Well Classification: ERIW Status: IJ - 1/25/2022
Well Name/No:UNION PACIFIC #13-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date1/25/2022
FacilityID:229137LocationID:430339
County:RIO BLANCO #103Location:NWSW 28 2N102W 6
Field:RANGELY - #72370Elevation:5268 ft.
Planned Location:1976FSL  667 FWLLat/Long: 40.112158 / -108.855291Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.112280 / -108.855440Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 1/25/2022             Measured TD: 6450 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 1/25/2022
Wellbore Permit
Permit #:100001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:11/11/1911
Measured TD:6450 ft.Measured PB depth:6425 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 2300 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 2300 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5617 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: , Bottom: 5617 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 0 in., Size: 5 in., Top: 5544 ft., Depth: 6448 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 740, Top: 5544 ft., Bottom: 6448 ft., Determination Method: CBL

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 1/25/2022                 Interval Top: 5652 ft.    Interval Bottom: 6272 ft.

 Completed Information for Formation WEBER
1st Production Date:10/1/1966Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/21/2022Treatment End Date:1/21/2022
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT AND 100 BBLS WATER
Total fluid used in treatment (bbls):195Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):100Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:11/25/2019Treatment End Date:N/A
Treatment Summary:HIGH CASING PRESSURE WAS FOUND ON UNION PACIFIC 13-28 AN DTHE WELL WAS SHUT IN, WELL WORK WAS COMPLETED, REPLACED LEAKING PACKER. WELL WILL BE RETURNED TO ACTIVE INJECTION UPON APPROVAL OF FORM 21. A WITNESS MIT IS SCHEDULED ON 11/14/19.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:7/12/2019Treatment End Date:N/A
Treatment Summary:TUBING PLUG WAS SET AT 5535 ON 7/12/2019.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/12/2018Treatment End Date:4/12/2018
Treatment Summary:PUMPED 4000 GALLONS 15% HCL WITH 100 BBLS WATER AT 0.6 BPM 1400PSI.
Total fluid used in treatment (bbls):195Max pressure during treatment (psi):1400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):100Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/11/2015Treatment End Date:8/11/2015
Treatment Summary:pumped 4000 gallons 15% HCl with 165 gallons Mosul solvent
Total fluid used in treatment (bbls):299Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):200Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:8/12/2008
Treatment Summary:ACIDIZE FORMATION WITH 4500 GALS HEATED 15% HCI, EOT @ 6418'
Tubing Size:2.875 in.Tubing Setting Depth:6259 ft.
Tubing Packer Depth:5463 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5652 ft.# Of Holes:276
Interval Bottom:6272 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)267724
GOR
GOR DeterminationMCFE
Average BOE per Day126.516
Average MCFE per Day733.796

 Federal Financial Assurance  i 

 Tribal Well  i No