Formation Treatment |
Treatment Type: | |
Treatment Date: | 5/19/2021 | Treatment End Date: | N/A |
Treatment Summary: | Background: Union Pacific 19-28 had 750 psi casing pressure and would not blow down with the COGCC on location. Well work to Cleaned out well and performed a Diversion Acid Job (Doc#402487912).
Well to be returned to active injection upon approval of form 21. MIT scheduled for 09/24/2020 |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 9/11/2020 | Treatment End Date: | 9/11/2020 |
Treatment Summary: | Performed Diversion Acid Job in Weber Zone 7: 93.5 bbls 15% HCL w/60 bbls NaCl and 25 bbls Open Path Reach LT.
|
Total fluid used in treatment (bbls): | 178 | Max pressure during treatment (psi): | 1200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 93 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/12/2019 | Treatment End Date: | 6/12/2019 |
Treatment Summary: | PUMPED 2000 GALLONS 15% hcl WITH 50 BBLS OF FRESH WATER |
Total fluid used in treatment (bbls): | 97 | Max pressure during treatment (psi): | 1390 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 6/10/2010 |
Treatment Summary: | PULLED PRODUCTION EQUIPMENT, CLEAN OUT WELLBORE, RAN NEW FIBERLINED TUBING WAITING ON APPROVAL ON FORM 31 |