| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/19/2025 | Treatment End Date: | 11/19/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2489 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 8/22/2025 | Treatment End Date: | N/A |
| Treatment Summary: | Perform Clean out replaced FL tubing and top packer good test, upgrade well head. An updated wellbore diagram and job summary are attached.
FIRST INJECTION 4/12/2011 |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 8/15/2023 | Treatment End Date: | N/A |
| Treatment Summary: | WORKOVER TO REPLACE TUBING AND UPPER PACKER. RETURN TO INJECTION PENDING AN APPROVED FORM 21. |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 5/9/2017 | Treatment End Date: | N/A |
| Treatment Summary: | VALIDATE AUGUST 2013 TUBING AND PACKER DEPTHS.
FIRST INJECTION 4/12/2011 |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 11/23/2010 |
| Treatment Summary: | JOB SCOPE - CONVERT TO INJECTION WELL JOB started 10/11/2010 JOB completed 10/29/2010
FOUND, ISOLATED AND REPAIRED CASING LEAK.
WAITING ON COGCC APPROVAL TO INJECT (FORM 33 SUBMITTED WITH JOB INTENT SUNDRIES 6/2010 |