Formation Treatment |
Treatment Type: | |
Treatment Date: | 5/7/2018 | Treatment End Date: | N/A |
Treatment Summary: |
|
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 12/7/2017 | Treatment End Date: | N/A |
Treatment Summary: | TUBING PLUG WAS SET AT 5604' ON 9/8/2017. WAS WAS CONVERTED TO INJECTION ON 5/3/1967. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/24/2015 | Treatment End Date: | 1/24/2015 |
Treatment Summary: | ADDED PERFS IN 3 RUNS 5823-6028', 6031-6089', 6125-6293' ADDING AN ADDITIONAL 87 HOLES.
PUMPED 4000 GALLONS 15% HCL AT 4.5 BPM |
Total fluid used in treatment (bbls): | 331 | Max pressure during treatment (psi): | 1440 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 236 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 11/23/2009 |
Treatment Summary: | AACID STIMULATION 11/23/09 PUMPED 2500 GALLONS 20% HCI THROUGH TUBING @ 5536' AVERAGE RATE 3.9 BPM @ AVERAGE PRESSURE OF 2000 PSI. |