Formation Treatment |
Treatment Type: | |
Treatment Date: | 8/31/2022 | Treatment End Date: | N/A |
Treatment Summary: | PER MOU REPORTING ON/OFF TOOL SET AT 6010'. Note correction to perforations. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/24/2019 | Treatment End Date: | 4/24/2019 |
Treatment Summary: | PUMPED 2000 GALLONS 15% HCL WITH 1080 GALLONS SOLVENT AND 80 BBLS WATER. |
Total fluid used in treatment (bbls): | 153 | Max pressure during treatment (psi): | 2100 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/8/2017 | Treatment End Date: | 12/8/2017 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL AND 170 BBLS WATER.
CONVERTED TO INJECTION IN FEB 1982 |
Total fluid used in treatment (bbls): | 265 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 170 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/6/2016 | Treatment End Date: | 10/6/2016 |
Treatment Summary: | PUMPED 2000 GALLONS 15% HCL AND 30 GALLONS MUSOL SOLVENT. 200 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 248 | Max pressure during treatment (psi): | 2433 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 200 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 3/12/2010 |
Treatment Summary: | ACID STIMULATION 3/12/2010 PUMPED 4000 GALLONS OF 20% HCI AND THROUGH END OF TUBING 6053.2 AT STARTING PRESSURE OF 1826 PSI 3.4 BPM. |