Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06163
Well Classification: ERIW Status: IJ - 12/1/2022
Well Name/No:UNION PACIFIC #54-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date12/1/2022
FacilityID:229084LocationID:311799
County:RIO BLANCO #103Location:NWNE 21 2N102W 6
Field:RANGELY - #72370Elevation:5346 ft.
Planned Location:657FNL  2006 FELLat/Long: 40.134020 / -108.845963Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.133986 / -108.845962Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 12/1/2022             Measured TD:

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 12/1/2022
Wellbore Permit
Permit #:100010 Expiration Date:12/6/1981
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:N/A
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 507 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 235, Top: 0 ft., Bottom: 507 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6296 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: , Bottom: 6296 ft., Determination Method:
Casing:String Type: 1ST LINER, Hole Size: , Size: 5 in., Top: 6095 ft., Depth: 6614 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 6095 ft., Bottom: 6614 ft., Determination Method:

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 12/1/2022                 Interval Top: 6329 ft.    Interval Bottom: 6516 ft.

 Completed Information for Formation WEBER
1st Production Date:2/1/1982Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:
Treatment Date:8/31/2022Treatment End Date:N/A
Treatment Summary:PER MOU REPORTING ON/OFF TOOL SET AT 6010'. Note correction to perforations.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/24/2019Treatment End Date:4/24/2019
Treatment Summary:PUMPED 2000 GALLONS 15% HCL WITH 1080 GALLONS SOLVENT AND 80 BBLS WATER.
Total fluid used in treatment (bbls):153Max pressure during treatment (psi):2100
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/8/2017Treatment End Date:12/8/2017
Treatment Summary:PUMPED 4000 GALLONS 15% HCL AND 170 BBLS WATER. CONVERTED TO INJECTION IN FEB 1982
Total fluid used in treatment (bbls):265Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):170Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/6/2016Treatment End Date:10/6/2016
Treatment Summary:PUMPED 2000 GALLONS 15% HCL AND 30 GALLONS MUSOL SOLVENT. 200 BBLS FRESH WATER
Total fluid used in treatment (bbls):248Max pressure during treatment (psi):2433
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):200Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/12/2010
Treatment Summary:ACID STIMULATION 3/12/2010 PUMPED 4000 GALLONS OF 20% HCI AND THROUGH END OF TUBING 6053.2 AT STARTING PRESSURE OF 1826 PSI 3.4 BPM.
Tubing Size:2.875 in.Tubing Setting Depth:6460 ft.
Tubing Packer Depth:6158 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6329 ft.# Of Holes:68
Interval Bottom:6516 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)125169
GOR
GOR DeterminationMCFE
Average BOE per Day59.257
Average MCFE per Day343.688

 Federal Financial Assurance  i 

 Tribal Well  i No