Formation Treatment |
Treatment Type: | |
Treatment Date: | 9/8/2020 | Treatment End Date: | N/A |
Treatment Summary: | WELL WORK IDENTIFIED NO CASING LEAK. CLEANED OUT FROM THE ON/OFF TOOL TO THE TOP PACKER AND RESET TOP PACKER. START UP OF WELL PENDING PASSING MIT. MIT SCHEDULED FOR 9/1/2020. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/20/2020 | Treatment End Date: | 3/20/2020 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID W/MUTUAL SOLVENT AND 36 BBLS FRESH WATER
|
Total fluid used in treatment (bbls): | 131 | Max pressure during treatment (psi): | 2200 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 36 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/12/2017 | Treatment End Date: | 5/14/2017 |
Treatment Summary: | pumped 4000 gallons 15% HCl and 240 bbls fresh water.
starting 0.75 bpm at 1600 psi
converted to injection 3/1/1976 |
Total fluid used in treatment (bbls): | 335 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 240 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 3/18/2010 |
Treatment Summary: | ACID STIMULATION 3/18/2010 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF TUBING 5981 AT STARTING PRESSURE OF 1041 PSI. |