Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 7/11/2019 | Treatment End Date: | 7/11/2019 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL w/3% CITRIC ACID AND 85 BBLS WATER. |
Total fluid used in treatment (bbls): | 132 | Max pressure during treatment (psi): | 2250 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 85 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/18/2017 | Treatment End Date: | 2/18/2017 |
Treatment Summary: | PUMPED 4000 GALLONS HCL, 120 GALLONS MUSOL SOLVENT AND 200 BBLS FRESH WATER. |
Total fluid used in treatment (bbls): | 298 | Max pressure during treatment (psi): | 1800 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 200 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/14/2015 | Treatment End Date: | 5/14/2015 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | 175 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/18/2013 | Treatment End Date: | 10/18/2013 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCLTHRU 1 1/4" COILED TUBING - EOT @ 6249' |
Total fluid used in treatment (bbls): | 95 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 9/30/2010 |
Treatment Summary: | ACID STIMULATIOMN 9/30/10 PUMPED 4000 GALS 20% HCL THROUGH TUBING @5997.6' |
Formation Treatment |
Treatment Date: | 11/9/2007 |
Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS 15% HCL, EOT @ 6240'. |