Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/11/2022 | Treatment End Date: | 4/12/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/ 6% CITRIC ACID AND 100 BBLS WATER
First injection 5/2/1969
|
Total fluid used in treatment (bbls): | 195 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 100 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/7/2017 | Treatment End Date: | 11/8/2017 |
Treatment Summary: | Bullhead 15% Hcl at 0.5 bpm @ 1400 psi, total 4000 gallons acid, flush with 240 gallons fresh water.
First injection 5/2/1969 |
Total fluid used in treatment (bbls): | 101 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 6 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/29/2015 | Treatment End Date: | 6/29/2015 |
Treatment Summary: | Bullhead 4000 gallons 15% HCl w/ 165 gallons solvent at 1.68 bpm @ starting 2400 psi |
Total fluid used in treatment (bbls): | 99 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 4/15/2011 |
Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS 20% HCl THROUGH END OF COILED TUBING AT 5917'. 2 7/8" tubing set at 5945' |
Formation Treatment |
Treatment Date: | 3/31/2009 |
Treatment Summary: | ACIDUZE FORMATION WITH 4000 GALLONS HEATED 20% HCL. |