Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-06144
Well Classification: ERIW Status: IJ - 5/31/2023
Well Name/No:FEE #29
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date5/31/2023
FacilityID:229066LocationID:314571
County:RIO BLANCO #103Location:NWNE 19 2N102W 6
Field:RANGELY - #72370Elevation:5373 ft.
Planned Location:800FNL  1980 FELLat/Long: 40.133595 / -108.883796Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.133622 / -108.883793Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 5/31/2023             Measured TD:

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 5/31/2023
Wellbore Permit
Permit #:100001 Expiration Date:10/1/1977
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:9/28/1946
Spud Date:7/31/1946Spud Date Is:ACTUAL
Measured TD:Measured PB depth:
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 34 ft., Weight: 65 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: , Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6075 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 1013 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 650, Top: , Bottom: , Determination Method:
Casing:String Type: 3RD, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6075 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: , Bottom: , Determination Method:
Casing:String Type: 1ST LINER, Hole Size: , Size: 5.5 in., Top: 5913 ft., Depth: 6543 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA2172 ft.2350 ft.NN
FRONTIER3109 ft.3192 ft.NN
MOWRY3380 ft.NN
DAKOTA3467 ft.NN
MORRISON3542 ft.NN
CURTIS4258 ft.NN
ENTRADA4360 ft.NN
CARMEL4508 ft.NN
NAVAJO4560 ft.NN
CHINLE5184 ft.NN
SHINARUMP5312 ft.NN
MOENKOPI5597 ft.NN
WEBER6062 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 5/31/2023                 Interval Top: 6106 ft.    Interval Bottom: 6540 ft.

 Completed Information for Formation WEBER
1st Production Date:7/1/1977Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/23/2023Treatment End Date:5/23/2023
Treatment Summary:PUMPED 163 BBLS 15% HCL & STIMWRX-DVG WITH MUTUAL SOLVENT AND 35 BBLS FRESH WATER
Total fluid used in treatment (bbls):198Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):163Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:1/25/2023Treatment End Date:1/25/2023
Treatment Summary:PUMPED 2016 GALLONS (47.9 BBL.)15% HCL WITH MUTUAL SOLVENT, 312 BBL. FRESH WATER
Total fluid used in treatment (bbls):360Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):312Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/17/2022Treatment End Date:5/17/2022
Treatment Summary:PUMPED 2000 GALLONS 15% HCL WITH MUTUAL SOLVENT, 35 BBLS FRESH WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/28/2020Treatment End Date:3/28/2020
Treatment Summary:PUMPED 2000 GALLONS 15% HCL WITH 1.9 BBLS MUTUAL SOLVENT, 38 BBLS FRESH WATER
Total fluid used in treatment (bbls):85Max pressure during treatment (psi):850
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):38Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/9/2019Treatment End Date:2/9/2019
Treatment Summary:PUMPED 2000 GALLONS 15% HCL WITH 110 GALLONS SOLVENT, 110 BBLS FRESH WATER.
Total fluid used in treatment (bbls):160Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):110Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/15/2017Treatment End Date:11/16/2017
Treatment Summary:CORRECTED NUMBER OF PERF HOLES AND THE FIRST INJECTION 7/1/1977 PUMPED 3800 GALLONS 15% HCL WITH 360 BBLS WATER
Total fluid used in treatment (bbls):450Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):90Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):360Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/1/2015Treatment End Date:10/1/2015
Treatment Summary:PUMP 165 GALLONS MOSUL SOLVENT AND 4000 GALLONS 15% HCL AT 3.0 BPM @ 2083 PSI
Total fluid used in treatment (bbls):279Max pressure during treatment (psi):2303
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):180Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/27/2013Treatment End Date:2/27/2013
Treatment Summary:COILED TUBING UNIT ACID JOB.
Total fluid used in treatment (bbls):263Max pressure during treatment (psi):1900
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):23Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):240Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:9/28/1946
Treatment Summary:
Tubing Size:2.875 in.Tubing Setting Depth:5653 ft.
Tubing Packer Depth:5598 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6106 ft.# Of Holes:64
Interval Bottom:6540 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)267802
GOR
GOR DeterminationMCFE
Average BOE per Day126.677
Average MCFE per Day734.690

 Federal Financial Assurance  i 

 Tribal Well  i No