Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/23/2023 | Treatment End Date: | 5/23/2023 |
Treatment Summary: | PUMPED 163 BBLS 15% HCL & STIMWRX-DVG WITH MUTUAL SOLVENT AND 35 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 198 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 163 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/25/2023 | Treatment End Date: | 1/25/2023 |
Treatment Summary: | PUMPED 2016 GALLONS (47.9 BBL.)15% HCL WITH MUTUAL SOLVENT, 312 BBL. FRESH WATER
|
Total fluid used in treatment (bbls): | 360 | Max pressure during treatment (psi): | 2500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 312 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/17/2022 | Treatment End Date: | 5/17/2022 |
Treatment Summary: | PUMPED 2000 GALLONS 15% HCL WITH MUTUAL SOLVENT, 35 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/28/2020 | Treatment End Date: | 3/28/2020 |
Treatment Summary: | PUMPED 2000 GALLONS 15% HCL WITH 1.9 BBLS MUTUAL SOLVENT, 38 BBLS FRESH WATER
|
Total fluid used in treatment (bbls): | 85 | Max pressure during treatment (psi): | 850 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 38 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/9/2019 | Treatment End Date: | 2/9/2019 |
Treatment Summary: | PUMPED 2000 GALLONS 15% HCL WITH 110 GALLONS SOLVENT, 110 BBLS FRESH WATER. |
Total fluid used in treatment (bbls): | 160 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 110 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/15/2017 | Treatment End Date: | 11/16/2017 |
Treatment Summary: | CORRECTED NUMBER OF PERF HOLES AND THE FIRST INJECTION 7/1/1977
PUMPED 3800 GALLONS 15% HCL WITH 360 BBLS WATER |
Total fluid used in treatment (bbls): | 450 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 90 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 360 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/1/2015 | Treatment End Date: | 10/1/2015 |
Treatment Summary: | PUMP 165 GALLONS MOSUL SOLVENT AND 4000 GALLONS 15% HCL AT 3.0 BPM @ 2083 PSI |
Total fluid used in treatment (bbls): | 279 | Max pressure during treatment (psi): | 2303 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 180 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/27/2013 | Treatment End Date: | 2/27/2013 |
Treatment Summary: | COILED TUBING UNIT ACID JOB. |
Total fluid used in treatment (bbls): | 263 | Max pressure during treatment (psi): | 1900 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 23 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 240 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 9/28/1946 |
Treatment Summary: | |