Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 12/7/2022 | Treatment End Date: | 12/7/2022 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS WATER |
Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2450 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 7/12/2021 | Treatment End Date: | 7/12/2021 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15 HCL W/6% CITRIC ACID AND 40 BBLS WATER |
Total fluid used in treatment (bbls): | 87 | Max pressure during treatment (psi): | 2100 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 3/20/2020 | Treatment End Date: | 3/20/2020 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS)15% HCL W/6% CITRIC ACID W/MUTUAL SOLVENT ADN 36 BBLS FRESH WATER
|
Total fluid used in treatment (bbls): | 131 | Max pressure during treatment (psi): | 2450 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 36 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/17/2017 | Treatment End Date: | 11/18/2017 |
Treatment Summary: | CORRECTION TO PERFORATION INTERVAL REPORTED ON LAST FORM 21.
PUMPED 4000 GALLON 15% HCL WITH 320 BBLS WATER.
FIRST INJECTION 5/5/1984 |
Total fluid used in treatment (bbls): | 415 | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 320 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 11/21/2010 |
Treatment Summary: | ACID STIMULATION 11/21/10 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF TUBING 5843.55' AT STARTING PRESSURE OF 900 PS @ 3.25 BPM. |