Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05910
Well Classification: ERIW Status: PA - 10/20/2023
Well Name/No:WILSON CREEK UNIT(MR-SN) #8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CHEVRON USA INC - 16700
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date10/20/2023
FacilityID:228911LocationID:314523
County:RIO BLANCO #103Location:SENW 26 3N94W 6
Field:WILSON CREEK - #93352Elevation:8042 ft.
Planned Location:1784FNL  1370 FWLLat/Long: 40.202740 / -107.910257Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.202981 / -107.910282Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: AB - 10/20/2023             Measured TD: 6895 ft.    Vertical TD: 6888 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        AB - 10/20/2023
Wellbore Permit
Permit #:100001 Expiration Date:2/24/2000
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-033781
Formation And Spacing:Code: MRSN , Formation: MORRISON , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:7/22/1998
Measured TD:6895 ft.Measured PB depth:6891 ft.
True Vertical TD:6888 ft.True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 17.5 in., Size: 13.375 in., Top: 1 ft., Depth: 495 ft., Weight: 54.5 , Citings Type: ACTUAL
Cement:Sacks: , Top: 0 ft., Bottom: 495 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: , Size: , Top: 1 ft., Depth: 6886 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: , Top: 5840 ft., Bottom: 6886 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MORRISON6635 ft.
SUNDANCE6851 ft.

Formation SNDC                     Formation Classification:  GW                     Status:  AB - 10/20/2023                Interval Top: 6875 ft.    Interval Bottom: 6884 ft.

 Completed Information for Formation SUNDANCE
1st Production Date:N/AChoke Size: 
Formation Name:SUNDANCECommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SNDC.
Perforation Data:
Interval Top:6875 ft.# Of Holes:
Interval Bottom:6884 ft.Hole Size:

Formation MR-SN                   Formation Classification:  ERIW                   Status:  CM - 11/27/2018                Interval Top: 6675 ft.    Interval Bottom: 6884 ft.

 Completed Information for Formation MORRISON-SUNDANCE
1st Production Date:1/1/1960Choke Size: 
Formation Name:MORRISON-SUNDANCECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/24/2018Treatment End Date:11/24/2018
Treatment Summary:PUMPED 1500 GALLONS 15% HCL, 60 GALLONS SOLVENT WITH 440 GALLONS FRESH WATER AT 4.8 BPM @ 35 PSI. FLUSHED WITH 10 BBLS BRINE WATER AND 51 BBLS INJECTION WATER.
Total fluid used in treatment (bbls):108Max pressure during treatment (psi):35
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):37Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):10Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:11/11/1911
Treatment Summary:PART OF ENHANCED RECOVERY UIC FACILITES 150139 AND 150143
Tubing Size:3.5 in.Tubing Setting Depth:6612 ft.
Tubing Packer Depth:6605 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MR-SN.
Perforation Data:
Interval Top:6675 ft.# Of Holes:169
Interval Bottom:6884 ft.Hole Size:0.5 in.

Formation MRSN                     Formation Classification:  GW                     Status:  AB - 10/20/2023                Interval Top: 6675 ft.    Interval Bottom: 6745 ft.

 Completed Information for Formation MORRISON
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:MORRISONCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation MRSN.
Perforation Data:
Interval Top:6675 ft.# Of Holes:
Interval Bottom:6745 ft.Hole Size:

Formation SN-MO                   Formation Classification:  ERIW                   Status:  CM - 11/13/2018                Interval Top: 6675 ft.    Interval Bottom: 6884 ft.

 Completed Information for Formation SUNDANCE-MORRISON
1st Production Date:1/1/1960Choke Size: 
Formation Name:SUNDANCE-MORRISONCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/1/2016Treatment End Date:8/27/2016
Treatment Summary:PUMPED 1500 GALLONS 15% HCL AND 500 GALLONS MUSOL SOLVENT AND 69 BBLS FRESH WATER
Total fluid used in treatment (bbls):117Max pressure during treatment (psi):150
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):69Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:3.5 in.Tubing Setting Depth:6634 ft.
Tubing Packer Depth:6626 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation SN-MO.
Perforation Data:
Interval Top:6675 ft.# Of Holes:169
Interval Bottom:6884 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedY10/20/2023
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No