Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05874
Well Classification: ERIW Status: SI - 12/1/2021
Well Name/No:WILSON CREEK MORRISON UNIT #20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:CHEVRON USA INC - 16700
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:48241
Facility Status:SIStatus Date12/1/2021
FacilityID:228882LocationID:314509
County:RIO BLANCO #103Location:SWNE 34 3N94W 6
Field:WILSON CREEK - #93352Elevation:8204 ft.
Planned Location:1500FNL  1654 FELLat/Long: 40.189010 / -107.921107Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.189140 / -107.921129Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 12/1/2021             Measured TD: 12702 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 12/1/2021
Wellbore Permit
Permit #:100000 Expiration Date:6/29/1998
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-033926
Formation And Spacing:Code: MRSN , Formation: MORRISON , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:5/13/1946
Spud Date:8/14/1944Spud Date Is:ACTUAL
Measured TD:12702 ft.Measured PB depth:6832 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: , Size: , Top: 0 ft., Depth: 23 ft., Weight: 94 , Citings Type: ACTUAL
Cement:Sacks: 6, Top: 0 ft., Bottom: 23 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: , Size: 13.375 in., Top: 0 ft., Depth: 603 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 603 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.5 in., Size: 9.625 in., Top: 0 ft., Depth: 7259 ft., Weight: 47 , Citings Type: ACTUAL
Cement:Sacks: 443, Top: 5844 ft., Bottom: 7259 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 9.625 in., Size: , Top: 7068 ft., Depth: 6920 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Casing:String Type: 2ND LINER, Hole Size: 8.625 in., Size: , Top: 6100 ft., Depth: 8200 ft., Weight: 26 , Citings Type: ACTUAL
Cement:Sacks: 185, Top: 7068 ft., Bottom: 8200 ft., Determination Method: CALC
Casing:String Type: OPEN HOLE, Hole Size: 8.625 in., Size: , Top: 8200 ft., Depth: 12702 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: SURF , Top: 477 ft., Depth: 600 ft., Bottom: 655 ft., Sacks: 300, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
MANCOS1132 ft.
NIOBRARA4080 ft.
FRONTIER5810 ft.
MOWRY6100 ft.
DAKOTA6195 ft.
MORRISON6332 ft.
SUNDANCE6817 ft.

Formation SNDC                     Formation Classification:  OW                     Status:  AB - 10/5/1999                 Interval Top: 6819 ft.    Interval Bottom: 6827 ft.

 Completed Information for Formation SUNDANCE
1st Production Date:N/AChoke Size: 
Formation Name:SUNDANCECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Date:10/5/1999
Treatment Summary:CEMENT SQUEEZE PERFORATIONS IN THE SUNDANCE FORMATION. SEE ATTACHED CEMENT SERVICE REPORT, AND JOB SUMMARY. SQUEEZED 80 SX CLASS G + ADDITIVES THROUGH CMT RETAINER SET AT 6741'
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/7/1997Test Method:PUMPING
Hours Tested:24Gas Type:
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 477
BBLS_OIL 14
MCF_GAS 0
Perforation Data:
Interval Top:6819 ft.# Of Holes:16
Interval Bottom:6827 ft.Hole Size:

Formation MRSN                     Formation Classification:  ERIW                     Status:  SI - 12/1/2021                 Interval Top: 6615 ft.    Interval Bottom: 6723 ft.

 Completed Information for Formation MORRISON
1st Production Date:N/AChoke Size: 
Formation Name:MORRISONCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/18/2018Treatment End Date:11/18/2018
Treatment Summary:ACID STIMULATION WITH 1500 GALLONS 15% HCL WITH 30 GALLONS SOLVENT AND 98 BBLS WATER
Total fluid used in treatment (bbls):145Max pressure during treatment (psi):40
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):35Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):98Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/6/2016Treatment End Date:9/6/2016
Treatment Summary:ACID STIMULATION WITH 1500 GALLONS 15% HCL AND 500 GALLONS SOLVENT WITH 150 BBLS WATER
Total fluid used in treatment (bbls):Max pressure during treatment (psi):130
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):150Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:10/17/2008
Treatment Summary:INJECTION TEST. RE-SET 7" INJECTION PACKER ON 2 7/8" 6.5# TK-15 TUBING AT 6537'. EOT AT 6576'. SET PLUG IN PACKER, TESTED TUBING, TESTED CASING AND CHART TO 500 PSI FOR 15 MINUTES - GOOD TEST.
Tubing Size:3.5 in.Tubing Setting Depth:6679 ft.
Tubing Packer Depth:6640 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1129
BBLS_OIL 40
MCF_GAS 26
Perforation Data:
Interval Top:6615 ft.# Of Holes:152
Interval Bottom:6723 ft.Hole Size:0.5 in.
Primary Well Designation:
Reported Plugged      i
            All DesignationsDate
Reported PluggedY09/16/2024
Out Of Service RepurposedN 
Out Of ServiceYPlugging Due Date
12/31/2028
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
08/31/2021
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2023 - November 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No