| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/22/2022 | Treatment End Date: | 6/22/2022 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT, 47 BBLS WATER |
| Total fluid used in treatment (bbls): | 94 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 47 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 8/4/2020 | Treatment End Date: | 8/4/2020 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT, 50 BBLS WATER. |
| Total fluid used in treatment (bbls): | 98 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/22/2018 | Treatment End Date: | 3/22/2018 |
| Treatment Summary: | PUMPED 2000 GALLONS (47 BBLS) 15% HCL WITH 167 BBLS WATER
|
| Total fluid used in treatment (bbls): | 214 | Max pressure during treatment (psi): | 2392 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 167 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 6/26/2009 |
| Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS HEATED 20% HCL. |