Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/23/2023 | Treatment End Date: | 1/23/2023 |
Treatment Summary: | Pumped 4000 Gallons (95.2 bbls) 15% HCL w/additives, inhibitor, mutual solvent and 35 bbls fresh water.
Converted to injection: 06/05/1972 |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2300 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 8/17/2022 | Treatment End Date: | N/A |
Treatment Summary: | UPGRADE TUBING HEAD EQUIPMENT AND RAN NEW UPPER PACKER. WELLBORE SCHMATIC ATTACHED. RETURN TO SERVICE PENDING AN APPROVED MIT. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/4/2022 | Treatment End Date: | 8/4/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/ MUTUAL SOLVENT AND 35 BBLS WATER |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 1/26/2022 | Treatment End Date: | 1/26/2022 |
Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/6% CITRIC ACID AND 90 BBLS WATER. |
Total fluid used in treatment (bbls): | 137 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 90 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/19/2020 | Treatment End Date: | 6/19/2020 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID AND 60 BBLS WATER.
|
Total fluid used in treatment (bbls): | 5 | Max pressure during treatment (psi): | 2430 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 60 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 9/16/2011 |
Treatment Summary: | PUMPED 4000 GALLONS OF 20% HCL THROUGH END OF TUBING 6460' AT STARTING PRESSURE OF 1200 PSI. 2 7/8" tubing set 7/2/11, paker depth 6270" |
Formation Treatment |
Treatment Date: | 2/18/2010 |
Treatment Summary: | ACID STIMULATION 2/18/2010 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF TUBING 6525.8'. AT STARTING PRESSURE OF 2200 PSI @ 1.5 BPM. OPEN HOLE 6387-6745 |