Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/19/2023 | Treatment End Date: | 4/19/2023 |
Treatment Summary: | PUMP 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT, AND 35 BBLS WATER
|
Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2500 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/21/2021 | Treatment End Date: | 11/21/2021 |
Treatment Summary: | PUMP 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT, AND 40 BBLS WATER |
Total fluid used in treatment (bbls): | 88 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 2/11/2021 | Treatment End Date: | 2/11/2021 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2BBLS) 15% HCL W/6% CITRIC ACID WITH SOLVENT AND 94 BBLS WATER.
|
Total fluid used in treatment (bbls): | 189 | Max pressure during treatment (psi): | 2300 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 94 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 8/4/2020 | Treatment End Date: | 8/4/2020 |
Treatment Summary: | PUMP 200 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT, 50 BBLS WATER
|
Total fluid used in treatment (bbls): | 98 | Max pressure during treatment (psi): | 2400 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 50 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/18/2019 | Treatment End Date: | 6/18/2019 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) OF 15% HCL WITH 80 BBLS OF FRESH WATER |
Total fluid used in treatment (bbls): | 175 | Max pressure during treatment (psi): | 1240 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 6/30/2015 | Treatment End Date: | 6/30/2015 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL W/ 165 GALLONS SOLVENT & 3800 GAL FRESH WATER AT 3.0 BPM
Open hole: 6514-6580 |
Total fluid used in treatment (bbls): | 190 | Max pressure during treatment (psi): | 2300 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 91 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Date: | 2/9/2009 |
Treatment Summary: | ACIDIZE FORMATION W/40500 GALS HEATED 20% HCI, EOT @ .6626'. TREATED THRU COILED TUBING. |