Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05770
Well Classification: ERIW Status: SI - 11/12/2025
Well Name/No:UNION PACIFIC #27-20
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date11/12/2025
FacilityID:228786LocationID:314470
County:RIO BLANCO #103Location:NENE 20 2N102W 6
Field:RANGELY - #72370Elevation:5377 ft.
Basin:PICEANCE BASIN  
Planned Location:688FNL  658 FELLat/Long: 40.133910 / -108.860110Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.133910 / -108.860110Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: SI - 11/12/2025             Measured TD: 6539 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        SI - 11/12/2025
Wellbore PermitVERTICAL
Permit #: Expiration Date:4/8/2028
Proposed Depth/Form:6539 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit:RANGELY Weber Unit Number:COC 047675X
Formation And Spacing:Code: NAVA , Formation: NAVAJO , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 2-27 , Unit Acreage: 19153, Drill Unit: see order
Casing:String Type: CONDUCTOR, Hole Size: 19 in., Size: 16 in., Top: 0 ft., Depth: 56 ft., Weight: 55 , Citings Type: PLANNED
Cement:Sacks: 75, Top: 0 ft., Bottom: 56 ft.
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 10.75 in., Top: 0 ft., Depth: 494 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 225, Top: 0 ft., Bottom: 494 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6214 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 1000, Top: 2150 ft., Bottom: 6214 ft.
Casing:String Type: OPEN HOLE, Hole Size: , Size: , Top: 6214 ft., Depth: 6539 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:

Wellbore Completed
Completion Date:N/A
Spud Date:1/5/1947Spud Date Is:ACTUAL
Measured TD:6539 ft.Measured PB depth:6539 ft.
True Vertical TD:True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Log Types:CBL previously submitted.
Casing:String Type: CONDUCTOR, Hole Size: 19 in., Size: 16 in., Top: 0 ft., Depth: 56 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: 0 ft., Bottom: 56 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 10.75 in., Top: 0 ft., Depth: 494 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 494 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6214 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 0 ft., Bottom: 6214 ft., Determination Method: CALC
Casing:String Type: OPEN HOLE, Hole Size: 8.75 in., Size: , Top: 6214 ft., Depth: 6539 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
MANCOS0 ft.
DAKOTA3600 ft.
MORRISON3702 ft.
CURTIS4400 ft.
ENTRADA4525 ft.4653 ft.NN
CARMEL4653 ft.4702 ft.NN
NAVAJO4702 ft.5310 ft.NN
CHINLE5310 ft.5493 ft.NN
SHINARUMP5493 ft.5530 ft.NN
MOENKOPI5530 ft.6210 ft.NN
WEBER6210 ft.6539 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  SI - 11/12/2025                Interval Top: 6214 ft.    Interval Bottom: 6539 ft.

 Completed Information for Formation WEBER
1st Production Date:3/26/1947Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:12/3/2025Treatment End Date:N/A
Treatment Summary:Converted to Injection 06/12/2025. Well work to repair tubing leak and set packer. Return to injection pending an approved Form 21.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:8/8/2025Treatment End Date:N/A
Treatment Summary:CONVERT WELL TO INJECTION - replaced top packer and tubing.
Total fluid used in treatment (bbls):0Max pressure during treatment (psi):2250
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):0Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:5/3/2017Treatment End Date:N/A
Treatment Summary:TUBING PLUG SET AT 6062' ON 10/13/2016
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:1/20/2016Treatment End Date:N/A
Treatment Summary:WELLWORK TO REPLACE PACKER AND RUN NEW TBG. LOG WELL
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:6108 ft.
Tubing Packer Depth:6045 ft.Tubing Multiple Packer:N ft.
Open Hole Top:6214 ft.Open Hole Bottom:6539 ft.
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6214 ft.# Of Holes:
Interval Bottom:6539 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No