| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/20/2025 | Treatment End Date: | 11/20/2025 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 37 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 132 | Max pressure during treatment (psi): | 2476 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 37 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 8/21/2025 | Treatment End Date: | N/A |
| Treatment Summary: | WELLWORK TO CLEAN OUT, REPLACED TUBING AND PACKER, AND UPGRADED COMPLETE WELLHEAD. OPERATIONS SUMMARY AND WBD ATTACHED.
RETURN TO INJECTION PENDING AN APPROVED FORM 21.
Converted to injection 2/18/1978 |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/13/2025 | Treatment End Date: | 6/13/2025 |
| Treatment Summary: | Pumped 1000 gallons (23.8 bbls) 15% HCL w/solvent and 50 bbls fresh water. |
| Total fluid used in treatment (bbls): | 73 | Max pressure during treatment (psi): | 2450 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 23 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 55 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/15/2023 | Treatment End Date: | 12/15/2023 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bbls) 15% HCL w/Solvent and 35 bbls Fresh water. |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2500 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 10/7/2022 | Treatment End Date: | 10/7/2022 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/MUTUAL SOLVENT AND 35 BBLS WATER. |
| Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2450 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/16/2021 | Treatment End Date: | 12/17/2021 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15%HCL w/ 6% Citric Acid and 65 bbls Water. |
| Total fluid used in treatment (bbls): | 112 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 65 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/26/2021 | Treatment End Date: | 3/26/2021 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15%HCL w/ 6% Citric Acid and 40 bbls Water. |
| Total fluid used in treatment (bbls): | 87 | Max pressure during treatment (psi): | 1820 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
| Total proppant used (lbs): | 87 | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/14/2019 | Treatment End Date: | 6/14/2019 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BLLS) OF 15% HCL WITH 80 BBLS OF FRESH WATER |
| Total fluid used in treatment (bbls): | 175 | Max pressure during treatment (psi): | 1330 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 80 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/30/2016 | Treatment End Date: | 6/30/2016 |
| Treatment Summary: | Pumped 2 bbls solvent, 47.6 bbls 15% HCl, and 175 bbls water at starting rate 2.8 bpm @ 2470 psi. |
| Total fluid used in treatment (bbls): | 225 | Max pressure during treatment (psi): | 2470 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 48 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 175 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 8/8/2011 |
| Treatment Summary: | ACID STIMULATION - PUMPED 3000 GALLONS OF 20% HCL THROUGH END OF COILED TUBING AT 6336' ATA A STARTING PRESSURE OF 300 PSI @ 1.1 BPM. |
| Formation Treatment |
| Treatment Date: | 8/18/2010 |
| Treatment Summary: | ACID STIMULATION 8/18/2010 PUMPED 3000 GALLONS FO 20% HCL THROUGH END OF TUBING 6336 AT STARTING PRESSURE OF 1600 1 BPM. |
| Formation Treatment |
| Treatment Date: | 11/7/2007 |
| Treatment Summary: | ACIDIZE FORMATION WITH 4000 GALLONS 15% HCI, EOT @ 6340'. |