Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05736
Well Classification: ERIW Status: IJ - 12/1/2023
Well Name/No:HAGOOD L N #A-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date12/1/2023
FacilityID:228756LocationID:314455
County:RIO BLANCO #103Location:SENE 23 2N103W 6
Field:RANGELY - #72370Elevation:5427 ft.
Planned Location:1980FNL  660 FELLat/Long: 40.130335 / -108.916587Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.130390 / -108.916530Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: DSPW             Status: IJ - 12/1/2023             Measured TD: 6610 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: DSPW        IJ - 12/1/2023
Wellbore Permit
Permit #:10001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-033586
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:11/15/1980
Measured TD:6610 ft.Measured PB depth:6550 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6014 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 1ST LINER, Hole Size: , Size: 5 in., Top: 5843 ft., Depth: 6610 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 5843 ft., Bottom: 6610 ft., Determination Method: CALC

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 12/1/2023                 Interval Top: 6014 ft.    Interval Bottom: 6164 ft.

 Completed Information for Formation WEBER
1st Production Date:10/16/1977Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/6/2022Treatment End Date:10/6/2022
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL with mutual solvent and 35 bbls water.
Total fluid used in treatment (bbls):83Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/9/2021Treatment End Date:12/9/2021
Treatment Summary:PUMPED 2000 BALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT AND 63 BBLS FRESH WATER
Total fluid used in treatment (bbls):110Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):63Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/30/2021Treatment End Date:6/30/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 45 BBLS WATER
Total fluid used in treatment (bbls):92Max pressure during treatment (psi):2180
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/27/2020Treatment End Date:4/27/2020
Treatment Summary:Pumped 2000 gallons (47.6 bbls) of 15% HCL with 6% citric inhibitor with 60 bbls of fresh water.
Total fluid used in treatment (bbls):107Max pressure during treatment (psi):2100
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):60Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/9/2020Treatment End Date:4/9/2020
Treatment Summary:Pumped 2000 gallons (47.6 bbls) 15% HCL and 70 bbls fresh water.
Total fluid used in treatment (bbls):117Max pressure during treatment (psi):1800
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):70Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/9/2019Treatment End Date:4/10/2019
Treatment Summary:Pumped 4000 gallons 15% HCL with 95 gallons solvent, 40 bbls fresh water.
Total fluid used in treatment (bbls):135Max pressure during treatment (psi):1910
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/19/2015Treatment End Date:3/19/2015
Treatment Summary:PUMPED 4000 GALLONS 15% HCL
Total fluid used in treatment (bbls):204Max pressure during treatment (psi):1200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):112Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:4/13/2010
Treatment Summary:ACIDIZE FORMATION WITH 400 GALLSON HEATED 20% HCI, EOT @ 6700 STARTING 1.7 BPM @ 2200 PSI
Formation Treatment
Treatment Date:2/25/2009
Treatment Summary:ACIDIZE FORMATION W/4000 GALS HEATED 20% HCI, EOT @ 6700'
Tubing Size:2.875 in.Tubing Setting Depth:5854 ft.
Tubing Packer Depth:5759 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6014 ft.# Of Holes:450
Interval Bottom:6164 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)254114
GOR
GOR DeterminationMCFE
Average BOE per Day120.621
Average MCFE per Day699.595

 Federal Financial Assurance  i Y

 Tribal Well  i No