Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05718
Well Classification: ERIW Status: IJ - 11/16/2022
Well Name/No:MCLAUGHLIN, A C #23
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date11/16/2022
FacilityID:228741LocationID:314447
County:RIO BLANCO #103Location:NWSW 23 2N103W 6
Field:RANGELY - #72370Elevation:5534 ft.
Planned Location:1880FSL  660 FWLLat/Long: 40.126425 / -108.930698Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.126550 / -108.930700Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 11/16/2022             Measured TD: 6721 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 11/16/2022
Wellbore Permit
Permit #:10001 Expiration Date:8/23/1980
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-032675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:7/17/2015
Spud Date:10/10/1946Spud Date Is:ACTUAL
Measured TD:6721 ft.Measured PB depth:6710 ft.
True Vertical TD:True Vertical PB depth:
Log Types:CBL - will submit the electronic version when received from vender.
Casing:String Type: CONDUCTOR, Hole Size: 20 in., Size: 16 in., Top: 0 ft., Depth: 36 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 60, Top: 0 ft., Bottom: 36 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 718 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 5000, Top: 0 ft., Bottom: 718 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.25 in., Size: 7 in., Top: 0 ft., Depth: 6176 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: , Bottom: 6176 ft., Determination Method:
Casing:String Type: 2ND, Hole Size: 6.125 in., Size: 5.5 in., Top: 0 ft., Depth: 6031 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 6031 ft., Determination Method: CBL
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 5 in., Top: 6031 ft., Depth: 6717 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 220, Top: 6031 ft., Bottom: 6717 ft., Determination Method: CALC
Additional Cement:String Type: 1ST , Top: 1732 ft., Depth: 1732 ft., Bottom: 1803 ft., Sacks: 165, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WEBER6031 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 11/16/2022                Interval Top: 6180 ft.    Interval Bottom: 6668 ft.

 Completed Information for Formation WEBER
1st Production Date:5/8/1972Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/10/2022Treatment End Date:11/10/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH SOLVENT AND 35 BBLS FRESH WATER
Total fluid used in treatment (bbls):82Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/18/2021Treatment End Date:11/18/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH SOLVENT AND 40 BBLS FRESH WATER
Total fluid used in treatment (bbls):Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/6/2021Treatment End Date:3/6/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID AND 40 BBLS WATER
Total fluid used in treatment (bbls):135Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):40Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/2/2020Treatment End Date:4/2/2020
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH SOLVENT AND 37 BBLS FRESH WATER
Total fluid used in treatment (bbls):84Max pressure during treatment (psi):2250
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):37Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:3/25/2009
Treatment Summary:ACID STIMULATION 3/25/09 PUMPED 4000 GALS HEATED 20% HCI W/ADDITIVES THROUGH TUBING AT 6415'.
Tubing Size:2.875 in.Tubing Setting Depth:6148 ft.
Tubing Packer Depth:5973 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6180 ft.# Of Holes:552
Interval Bottom:6668 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)185917
GOR
GOR DeterminationMCFE
Average BOE per Day87.623
Average MCFE per Day508.221

 Federal Financial Assurance  i Y

 Tribal Well  i No