Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05691
Well Classification: ERIW Status: IJ - 12/12/2022
Well Name/No:HAGOOD L N #A-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date12/12/2022
FacilityID:228718LocationID:314434
County:RIO BLANCO #103Location:SWSE 23 2N103W 6
Field:RANGELY - #72370Elevation:5475 ft.
Planned Location:660FSL  1930 FELLat/Long: 40.123055 / -108.921167Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.123120 / -108.921070Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 12/12/2022             Measured TD: 6630 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 12/12/2022
Wellbore Permit
Permit #:460000 Expiration Date:1/1/1901
Prop Depth/Form:6550 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number:D-033586
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:6/8/1983
Spud Date:4/20/1946Spud Date Is:ACTUAL
Measured TD:6630 ft.Measured PB depth:6630 ft.
True Vertical TD:True Vertical PB depth:
Log Types:MULTI SENSOR CALIPER AND CEMENT BOND LOG
Casing:String Type: CONDUCTOR, Hole Size: , Size: 13.375 in., Top: 0 ft., Depth: 176 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: , Bottom: , Determination Method:
Casing:String Type: SURF, Hole Size: 10.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1600 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1600 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.25 in., Size: 7 in., Top: 0 ft., Depth: 5970 ft., Weight: 20-23 , Citings Type: ACTUAL
Cement:Sacks: 915, Top: , Bottom: 5970 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 5 in., Top: 5813 ft., Depth: 6630 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 375, Top: 5813 ft., Bottom: 6630 ft., Determination Method: CALC
Additional Cement:String Type: 1ST , Top: 5986 ft., Depth: 5848 ft., Bottom: 6260 ft., Sacks: 100, Method: SQUEEZE
Additional Cement:String Type: 1ST , Top: 5986 ft., Depth: 5848 ft., Bottom: 6260 ft., Sacks: 75, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WEBER5986 ft.6630 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 12/12/2022                Interval Top: 6246 ft.    Interval Bottom: 6535 ft.

 Completed Information for Formation WEBER
1st Production Date:1/2/2001Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:12/7/2022Treatment End Date:12/7/2022
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 35 BBLS WATER
Total fluid used in treatment (bbls):83Max pressure during treatment (psi):2450
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/22/2021Treatment End Date:6/22/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/MUTUAL SOLVENT, 55 BBLS WATER
Total fluid used in treatment (bbls):102Max pressure during treatment (psi):1820
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):55Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:12/17/2013Treatment End Date:N/A
Treatment Summary:ORIGINAL PERF INTERVAL 5986-6620' PLUGGED WEBER ZONES 1,3, AND 4. CEMENT SQUEEZED CIBP RUN TO 6535' OPEN PERFS 6246-6535
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:11/7/2008
Treatment Summary:ACIDIZE FORMATION WITH 4000 GALLONS HEATED 15% HCI, EOT @ 6400'
Tubing Size:2.875 in.Tubing Setting Depth:6293 ft.
Tubing Packer Depth:5764 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6246 ft.# Of Holes:51
Interval Bottom:6535 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)104808
GOR
GOR DeterminationMCFE
Average BOE per Day49.517
Average MCFE per Day287.206

 Federal Financial Assurance  i Y

 Tribal Well  i No