Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05690
Well Classification: ERIW Status: IJ - 3/15/2021
Well Name/No:LARSON, M B #C-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date3/15/2021
FacilityID:228717LocationID:314433
County:RIO BLANCO #103Location:SESE 22 2N103W 6
Field:RANGELY - #72370Elevation:5599 ft.
Planned Location:660FSL  660 FELLat/Long: 40.123075 / -108.935448Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.123120 / -108.935400Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 3/15/2021             Measured TD: 6759 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 3/15/2021
Wellbore Permit
Permit #:10001 Expiration Date:5/22/1982
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-053980
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:4/21/2008
Spud Date:5/27/1947Spud Date Is:ACTUAL
Measured TD:6759 ft.Measured PB depth:6759 ft.
True Vertical TD:True Vertical PB depth:
Log Types:NO NEW LOGS
Casing:String Type: CONDUCTOR, Hole Size: 16 in., Size: 13.375 in., Top: 0 ft., Depth: 177 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 130, Top: 0 ft., Bottom: 177 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2992 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 350, Top: 0 ft., Bottom: 2992 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6450 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 4483 ft., Bottom: 6450 ft., Determination Method: CBL
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 6450 ft., Weight: , Citings Type: HISTORICAL
Cement:Sacks: 0, Top: 0 ft., Bottom: , Determination Method:
Casing:String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 6330 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 6330 ft., Determination Method: CALC
Casing:String Type: OPEN HOLE, Hole Size: 6.125 in., Size: , Top: 6450 ft., Depth: 6759 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
Additional Cement:String Type: 1ST , Top: 0 ft., Depth: 2080 ft., Bottom: 2225 ft., Sacks: 430, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
NAVAJO4997 ft.NN
CHINLE5625 ft.NN
SHINARUMP5727 ft.NN
MOENKOPI5797 ft.NN
WEBER6440 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 3/15/2021                 Interval Top: 6450 ft.    Interval Bottom: 6759 ft.

 Completed Information for Formation WEBER
1st Production Date:4/24/1985Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/5/2021Treatment End Date:3/5/2021
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/6% CITRIC ACID AND 45 BBLS WATER
Total fluid used in treatment (bbls):140Max pressure during treatment (psi):2300
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):45Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/14/2019Treatment End Date:9/14/2019
Treatment Summary:PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL WITH 6% CITRIC ACID, 80 BBLS OF WATER.
Total fluid used in treatment (bbls):127Max pressure during treatment (psi):2200
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):80Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/28/2015Treatment End Date:3/28/2015
Treatment Summary:ACID STIMULATION WITH 4000 GALLONS 15% HCL TUBING INFORMATION CORRECTED TO 4/21/2008 WORKOVER TUBING LANDING DETAIL
Total fluid used in treatment (bbls):180Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):85Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/5/2007
Treatment Summary:ACIDIZE FORMATION WITH 3000 GALLONS 15% HCI, EOT @6645'.
Tubing Size:2.875 in.Tubing Setting Depth:6481 ft.
Tubing Packer Depth:6228 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6450 ft.# Of Holes:
Interval Bottom:6759 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)204334
GOR
GOR DeterminationMCFE
Average BOE per Day97.143
Average MCFE per Day563.427

 Federal Financial Assurance  i Y

 Tribal Well  i No