Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/19/2022 | Treatment End Date: | 5/19/2022 |
Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL WITH SOLVENT AND 35 BBLS WATER
CONVERTED TO INJECTION 03/25/1966 |
Total fluid used in treatment (bbls): | 130 | Max pressure during treatment (psi): | 2450 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 11/7/2014 | Treatment End Date: | 11/7/2014 |
Treatment Summary: | PUMPED 4000 GALLONS 15% HCL |
Total fluid used in treatment (bbls): | 170 | Max pressure during treatment (psi): | 2080 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 75 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 10/10/2012 | Treatment End Date: | 10/10/2012 |
Treatment Summary: | PUMP 3777 GALLONS 15 % HCL THROUGH 1 1/2" COILED TUBING AT 6411'. |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 89 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 40 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Date: | 11/16/2010 |
Treatment Summary: | ACID STIMULATION 11/16/10 PUMPED 2000 GALLONS OF 20% HCI THROUGH TUBING AT 6612' |
Formation Treatment |
Treatment Date: | 8/4/2009 |
Treatment Summary: | ACID STIMULATION 8/4/09 PUMPED 2000 GALS 20% HCI & 10,500 GALS CLO2 THROUGH TUBING AT 6612'. |