Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05668
Well Classification: ERIW Status: IJ - 11/19/2025
Well Name/No:FEE #10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date11/19/2025
FacilityID:228701LocationID:314419
County:RIO BLANCO #103Location:NENE 29 2N102W 6
Field:RANGELY - #72370Elevation:5279 ft.
Basin:PICEANCE BASIN  
Planned Location:660FNL  660 FELLat/Long: 40.119435 / -108.860066Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.119520 / -108.860160Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 11/19/2025             Measured TD: 6379 ft.    Vertical TD: 0 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 11/19/2025
Wellbore Permit
Permit #:450000 Expiration Date:1/27/1946
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:2/12/1946
Measured TD:6379 ft.Measured PB depth:0 ft.
True Vertical TD:0 ft.True Vertical PB depth:
Top PZ Location:Sec: Twp: Footage: 0 FL  0 FL
Casing:String Type: CONDUCTOR, Hole Size: , Size: 16 in., Top: 0 ft., Depth: 40 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: , Size: 10.75 in., Top: 0 ft., Depth: 1052 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 750, Top: 0 ft., Bottom: 1052 ft., Determination Method:
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5723 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1200, Top: 0 ft., Bottom: 5723 ft., Determination Method:
Casing:String Type: OPEN HOLE, Hole Size: , Size: , Top: 5723 ft., Depth: 6379 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 11/19/2025                Interval Top: 5737 ft.    Interval Bottom: 6379 ft.

 Completed Information for Formation WEBER
1st Production Date:2/1/1946Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/18/2025Treatment End Date:11/18/2025
Treatment Summary:PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER
Total fluid used in treatment (bbls):130Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):0Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):35Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:3/26/2024Treatment End Date:3/26/2024
Treatment Summary:Pumped 4000 gallons (95.2 bbls) 15% HCL w/solvent and 38 bbls fresh water Converted to injection 07/08/2010 Note: Correction to top packer depth, wellbore schematic attached.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:6/22/2010
Treatment Summary:PULL PRODUCTION STRING, AND ELECTRIC SUBMERSIBLE PUMP CLEAN OUT WITH 6 1/8" BIT TO 6340', CIRCULATE WITH FOAM AIR UNIT. INSTALL NEW WELLHEAD, AND RUN 178 JOINTS NEW FIBERLINED TUBING.
Tubing Size:2.875 in.Tubing Setting Depth:5720 ft.
Tubing Packer Depth:5654 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5737 ft.# Of Holes:
Interval Bottom:6379 ft.Hole Size:
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YDefined Inactive
04/30/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No