Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-05636
Well Classification: ERIW Status: IJ - 5/1/2023
Well Name/No:EMERALD #13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date5/1/2023
FacilityID:228672LocationID:314406
County:RIO BLANCO #103Location:SENE 26 2N103W 6
Field:RANGELY - #72370Elevation:5464 ft.
Planned Location:1988FNL  660 FELLat/Long: 40.115836 / -108.916572Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.115841 / -108.916584Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: AB - 2/27/2013             Measured TD: 6581 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        AB - 2/27/2013
Wellbore Permit
Permit #:10001 Expiration Date:8/1/1947
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:12/20/1982
Spud Date:3/29/1947Spud Date Is:ACTUAL
Measured TD:6581 ft.Measured PB depth:5692 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 18.25 in., Size: 16 in., Top: 0 ft., Depth: 58 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 58 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.25 in., Size: 10.75 in., Top: 0 ft., Depth: 729 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 729 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5868 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 2310 ft., Bottom: 5868 ft., Determination Method: CALC
Casing:String Type: 1ST LINER, Hole Size: 7 in., Size: 5 in., Top: 5755 ft., Depth: 6579 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 475, Top: 5755 ft., Bottom: 6579 ft., Determination Method: CALC
Additional Cement:String Type: 1ST LINER , Top: 5692 ft., Depth: 6518 ft., Bottom: 6518 ft., Sacks: 106, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WEBER5860 ft.6560 ft.NN

Formation WEBR                     Formation Classification:  GW                     Status:  AB - 2/27/2013                 Interval Top: 5860 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size:0.000 in.
Formation Name:WEBERCommingled:
Production Method:
Open Hole Completion:
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
No Perforation Data was found for formation WEBR.

Sidetrack #01             Wellbore Classification: ERIW             Status: IJ - 5/1/2023             Measured TD: 6572 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: ERIW        IJ - 5/1/2023
Wellbore PermitDRIFTED
Permit #: Expiration Date:10/30/2014
Prop Depth/Form:6550 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit:RANGELY WEBER Unit Number:COC47675X
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 18.25 in., Size: 16 in., Top: 0 ft., Depth: 58 ft., Weight: 55 , Citings Type: PLANNED
Cement:Sacks: 100, Top: 0 ft., Bottom: 58 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 729 ft., Weight: 40.5 , Citings Type: PLANNED
Cement:Sacks: 500, Top: 0 ft., Bottom: 729 ft.
Casing:String Type: 1ST, Hole Size: 8.25 in., Size: 7 in., Top: 0 ft., Depth: 5868 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 1250, Top: 2310 ft., Bottom: 5868 ft.
Casing:String Type: 1ST LINER, Hole Size: 6.125 in., Size: 5 in., Top: 5457 ft., Depth: 6550 ft., Weight: 18 , Citings Type: PLANNED
Cement:Sacks: 66, Top: 5457 ft., Bottom: 6550 ft.
Casing:String Type: 1ST TAPER, Hole Size: 8.25 in., Size: 5.5 in., Top: 0 ft., Depth: 5457 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: 230, Top: 0 ft., Bottom: 5457 ft.

Wellbore Completed
Completion Date:6/4/2013
Spud Date:7/1/2013Spud Date Is:ACTUAL
Measured TD:6572 ft.Measured PB depth:6572 ft.
True Vertical TD:True Vertical PB depth:
Log Types:MAILED CBL 6/25/2013
Casing:String Type: CONDUCTOR, Hole Size: 18.25 in., Size: 16 in., Top: 0 ft., Depth: 58 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 160, Top: 0 ft., Bottom: 58 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.25 in., Size: 10.75 in., Top: 0 ft., Depth: 729 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 729 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5868 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 2310 ft., Bottom: 5868 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5467 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 1610 ft., Bottom: 5467 ft., Determination Method: CBL
Casing:String Type: TAPER, Hole Size: 6.25 in., Size: 5 in., Top: 5467 ft., Depth: 6572 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 5514 ft., Bottom: 6572 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WEBER5857 ft.6572 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 5/1/2023                  Interval Top: 6128 ft.    Interval Bottom: 6516 ft.

 Completed Information for Formation WEBER
1st Production Date:12/21/1982Choke Size: 
Formation Name:WEBERCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:11/20/2021Treatment End Date:11/20/2021
Treatment Summary:PUMPED 2000 GALLONS (47.6 bbls) 15% HCL WITH GALLONS SOLVENT, 44 BBLS FRESH WATER
Total fluid used in treatment (bbls):Max pressure during treatment (psi):2400
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):44Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:6/11/2013Treatment End Date:6/11/2013
Treatment Summary:PERFS AT 6128-96, 6210-48', 6264-80', 6300-06', 6316-24', 6330-38', 6384-6406', 6434-60', 64565-78', 6500-16'. BREAKDOWN PERFS WITH 15% HCL ACID
Total fluid used in treatment (bbls):80Max pressure during treatment (psi):2500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):10Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):70Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:6138 ft.
Tubing Packer Depth:6052 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6128 ft.# Of Holes:663
Interval Bottom:6516 ft.Hole Size:3.125 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)358602
GOR
GOR DeterminationMCFE
Average BOE per Day167.064
Average MCFE per Day968.957

 Federal Financial Assurance  i 

 Tribal Well  i No