| Formation Treatment |
| Treatment Type: | |
| Treatment Date: | 1/7/2026 | Treatment End Date: | N/A |
| Treatment Summary: | Repair suspected communication between the tubing and casing. Work included releasing both packers and production tubing, cleaned out, set bottom packer, set plug in profile tested tubing and casing, good tests. Changed out tubing head and landed well, tested tubing and pretested casing good tests. Operations summary and updated wellbore diagram attached. Return to injection pending an approved Form 21. MIT scheduled for December 11, 2025. |
| Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 1/21/2025 | Treatment End Date: | 1/21/2025 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bbls) 15% HCL w/solvent and 150 bbls Fresh water. |
| Total fluid used in treatment (bbls): | 197 | Max pressure during treatment (psi): | 956 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 100 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 150 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/22/2024 | Treatment End Date: | 3/22/2024 |
| Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL W/SOLVENT AND 44 BBLS FRESH WATER. |
| Total fluid used in treatment (bbls): | 139 | Max pressure during treatment (psi): | 2180 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 44 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 1/4/2020 | Treatment End Date: | 1/4/2020 |
| Treatment Summary: | PUMPED 3822 GALLONS (91 BBLS) 15% HCL ACID AND 120 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 211 | Max pressure during treatment (psi): | 1850 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 91 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 120 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 7/1/2015 | Treatment End Date: | 7/1/2015 |
| Treatment Summary: | pumped 4000 gallons w/ 248 gallons solventat 1.9 bpm @ 2460 psi. |
| Total fluid used in treatment (bbls): | 202 | Max pressure during treatment (psi): | 2460 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 101 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 8/20/2009 |
| Treatment Summary: | ACID STIMULATION 8/19/09 PUMPED 2000 GALS 20% HCI & 10,500 GALS CLO2 IN FOUR STAGES THROUGH TUBING AT 5611'. AVERAGE 3.5 BPM @ 1762 PSI |