Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 5/17/2023 | Treatment End Date: | 5/17/2023 |
Treatment Summary: | CONVERTED TO INJECTION: 12-22-1966
PUMPED 47 BBLS 15% HCL WITH INJIBITOR AND MUTUAL SOLVENT & 35 BBLS FRESH WATER |
Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2210 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | |
Treatment Date: | 11/11/2015 | Treatment End Date: | N/A |
Treatment Summary: | CORRECTING PERFORATION INTERVAL SUBMITTED ON DOC#400602641 |
Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: |
Formation Treatment |
Treatment Type: | ACID JOB |
Treatment Date: | 4/30/2014 | Treatment End Date: | 4/30/2014 |
Treatment Summary: | 15% HCL PUMPED DOWN TUBING. |
Total fluid used in treatment (bbls): | 146 | Max pressure during treatment (psi): | 2000 |
Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
Type Of gas: | | Number Of staged intervals: | |
Total acid used in treatment (bbls): | 98 | Min frac gradient (psi/ft): | |
Recycled water used in treatment (bbls): | 48 | Total flowback volume recovered (bbls): | |
Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE |
Total proppant used (lbs): | | Green completions techniques utilized: | -- |
Reason green techniques Not utilized: PIPELINE |
Formation Treatment |
Treatment Date: | 2/10/2010 |
Treatment Summary: | ACID STIMULATION 2/10/10 PUMPED 4000 GALS 20% HCI THROUGH COILED TUBING AT 6615' @ STARTING 1500 PSI. |