Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-01060
Well Classification: ERIW Status: IJ - 1/29/2016
Well Name/No:RECTOR #3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date1/29/2016
FacilityID:228142LocationID:314264
County:RIO BLANCO #103Location:SWSE 34 2N102W 6
Field:RANGELY - #72370Elevation:5212 ft.
Planned Location:232FSL  2762 FWLLat/Long: 40.092851 / -108.828740Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.092944 / -108.829031Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 1/29/2016             Measured TD: 6347 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 1/29/2016
Wellbore Permit
Permit #:100001 Expiration Date:2/24/2000
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit: Unit Number: 
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:1/3/1979
Spud Date:6/26/1946Spud Date Is:ACTUAL
Measured TD:6347 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Casing:String Type: SURF, Hole Size: , Size: 13.375 in., Top: 0 ft., Depth: 376 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 376 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: , Size: 7 in., Top: 0 ft., Depth: 5586 ft., Weight: 20, 23 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 2150 ft., Bottom: 5586 ft., Determination Method: TEMP

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 1/29/2016                 Interval Top: 5586 ft.    Interval Bottom: 6347 ft.

 Completed Information for Formation WEBER
1st Production Date:N/AChoke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:
Treatment Date:6/8/2016Treatment End Date:N/A
Treatment Summary:Wellwork to repair wellhead assembly and run new tubing and packer.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Date:1/25/2007
Treatment Summary:ACIDIZE FORMATION WITH 3000 GALLONS 15% HCI, EOT @6050'.
Tubing Size:2.875 in.Tubing Setting Depth:5602 ft.
Tubing Packer Depth:5278 ft.Tubing Multiple Packer:
Open Hole Top:5586 ft.Open Hole Bottom:6347 ft.
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:5586 ft.# Of Holes:
Interval Bottom:6347 ft.Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)262608
GOR
GOR DeterminationMCFE
Average BOE per Day124.118
Average MCFE per Day719.890

 Federal Financial Assurance  i 

 Tribal Well  i No