Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-01055
Well Classification: ERIW Status: IJ - 10/18/2021
Well Name/No:MCLAUGHLIN, A C #22
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:IJStatus Date10/18/2021
FacilityID:228137LocationID:314261
County:RIO BLANCO #103Location:SESW 14 2N103W 6
Field:RANGELY - #72370Elevation:5453 ft.
Planned Location:660FSL  1980 FWLLat/Long: 40.137575 / -108.925868Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.137620 / -108.925910Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: IJ - 10/18/2021             Measured TD: 6695 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        IJ - 10/18/2021
Wellbore Permit
Permit #:10001 Expiration Date:2/5/1972
Prop Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-023675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:11/23/1977
Spud Date:8/8/1946Spud Date Is:ACTUAL
Measured TD:6695 ft.Measured PB depth:6690 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 18.75 in., Size: 16 in., Top: 0 ft., Depth: 37 ft., Weight: 55 , Citings Type: ACTUAL
Cement:Sacks: 65, Top: 0 ft., Bottom: 37 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 990 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 990 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6205 ft., Weight: 23/26 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 2290 ft., Bottom: 6205 ft., Determination Method: CALC
Casing:String Type: 2ND, Hole Size: 7 in., Size: 5.5 in., Top: 0 ft., Depth: 5987 ft., Weight: 17 , Citings Type: ACTUAL
Cement:Sacks: 294, Top: 0 ft., Bottom: 5987 ft., Determination Method: VISU
Casing:String Type: 1ST LINER, Hole Size: , Size: 5 in., Top: 5987 ft., Depth: 6690 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 5987 ft., Bottom: 6690 ft., Determination Method:
Casing:String Type: TAPER, Hole Size: 7 in., Size: 5 in., Top: 5987 ft., Depth: 6690 ft., Weight: 18 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 5987 ft., Bottom: 6690 ft., Determination Method: CALC
FormationInterval TopLog BottomCoredDSTs
DAKOTA3595 ft.NN
MORRISON3701 ft.NN
CURTIS4391 ft.NN
ENTRADA4487 ft.NN
CARMEL4627 ft.NN
NAVAJO4680 ft.NN
CHINLE5322 ft.NN
SHINARUMP5435 ft.NN
MOENKOPI5515 ft.NN
WEBER6192 ft.NN

Formation WEBR                     Formation Classification:  ERIW                     Status:  IJ - 10/18/2021                Interval Top: 6220 ft.    Interval Bottom: 6669 ft.

 Completed Information for Formation WEBER
1st Production Date:11/25/1977Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:10/16/2021Treatment End Date:10/16/2021
Treatment Summary:PUMP 2000 GALLONS (47.6 BBLS) 15% HCL WITH 38 BBLS FRESH WATER
Total fluid used in treatment (bbls):85Max pressure during treatment (psi):1700
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):47Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):38Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:10/11/2021Treatment End Date:N/A
Treatment Summary:High casing pressure was found on AC McLaughlin 22 and the well was shut in. Wellwork was completed, ran 5-1/2”, 17#, L-80 liner to tie-back into 5” liner @ 5987’. Well scheduled for a witness mit on Sept 7th. Well will be returned to active injection upon approval of Form 21.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/4/2020Treatment End Date:4/4/2020
Treatment Summary:PUMPED 4000 GALLONS (95 BBLS) 15% HCL WITH SOLVENT AND 37 BBLS FRESH WATER
Total fluid used in treatment (bbls):132Max pressure during treatment (psi):2350
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):37Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:2/12/2019Treatment End Date:2/12/2019
Treatment Summary:PUMP 4000 GALLONS 15% HCL WITH 170 BBLS FRESH WATER
Total fluid used in treatment (bbls):265Max pressure during treatment (psi):850
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):170Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:9/10/2018Treatment End Date:N/A
Treatment Summary:TUBING PLUG SET AT 5950 ON 9/10/2018
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:
Treatment Date:12/7/2017Treatment End Date:N/A
Treatment Summary:COA from document #401254362, "provide updated Form 5A". First injection 11/25/1977. Corrections to tubing depth and # of perf holes.
Total fluid used in treatment (bbls):Max pressure during treatment (psi):
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):Disposition method For flowback:
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:7/16/2013Treatment End Date:7/16/2013
Treatment Summary:ACID STIMULATION
Total fluid used in treatment (bbls):167Max pressure during treatment (psi):1500
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):92Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):75Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Formation Treatment
Treatment Date:11/7/2008
Treatment Summary:ACIDIZE FORMATION WITH 4000 GALLONS HEATED 15% HCI, EOT @ 5905
Tubing Size:2.875 in.Tubing Setting Depth:6009 ft.
Tubing Packer Depth:5950 ft.Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WEBR.
Perforation Data:
Interval Top:6220 ft.# Of Holes:276
Interval Bottom:6669 ft.Hole Size:0.5 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
June 2023 - May 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)260154
GOR
GOR DeterminationMCFE
Average BOE per Day122.782
Average MCFE per Day712.138

 Federal Financial Assurance  i Y

 Tribal Well  i No