|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: IJ - 5/1/2023 Measured TD: 6705 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW IJ - 5/1/2023 | Wellbore Permit | | Permit #: | 10001 | Expiration Date: | 1/6/1956 | Proposed Depth/Form: | | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEDERAL | Surface Owner: | Not available | Unit: | | Unit Number: | D-032675 | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 5/26/1947 | Spud Date: | 3/12/1947 | Spud Date Is: | ACTUAL | Measured TD: | 6705 ft. | Measured PB depth: | 6705 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | NO NEW LOGS | Log Types: | CBL, CAL, GR, CCL | Casing: | String Type: CONDUCTOR, Hole Size: 21 in., Size: 16 in., Top: 0 ft., Depth: 59 ft., Weight: 55 , Citings Type: ACTUAL | Cement: | Sacks: 100, Top: 0 ft., Bottom: 59 ft., Determination Method: VISU | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 10.75 in., Top: 0 ft., Depth: 747 ft., Weight: 40.5 , Citings Type: ACTUAL | Cement: | Sacks: 500, Top: 0 ft., Bottom: 747 ft., Determination Method: VISU | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 6410 ft., Weight: 23 , Citings Type: ACTUAL | Cement: | Sacks: 1250, Top: 4378 ft., Bottom: 6410 ft., Determination Method: CBL | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 5.5 in., Top: 0 ft., Depth: 6295 ft., Weight: 17 , Citings Type: ACTUAL | Cement: | Sacks: 285, Top: 0 ft., Bottom: 6295 ft., Determination Method: VISU | Casing: | String Type: OPEN HOLE, Hole Size: 6.125 in., Size: , Top: 6410 ft., Depth: 6705 ft., Weight: , Citings Type: ACTUAL | Cement: | Sacks: , Top: , Bottom: , Determination Method: | Additional Cement: | String Type: 1ST , Top: 2183 ft., Depth: 2331 ft., Bottom: 2362 ft., Sacks: 50, Method: SQUEEZE | Additional Cement: | String Type: 2ND , Top: 0 ft., Depth: 6243 ft., Bottom: 6295 ft., Sacks: 286, Method: STAGE TOOL | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 2679 ft. | | N | N | FRONTIER | 3440 ft. | | N | N | MOWRY | 3712 ft. | | N | N | DAKOTA | 3796 ft. | | N | N | MORRISON | 3883 ft. | | N | N | CURTIS | 4596 ft. | | N | N | ENTRADA | 4697 ft. | | N | N | CARMEL | 4840 ft. | | N | N | NAVAJO | 4896 ft. | | N | N | CHINLE | 5522 ft. | | N | N | SHINARUMP | 5640 ft. | | N | N | MOENKOPI | 5715 ft. | | N | N | WEBER | 6404 ft. | | N | N |
Formation WEBR Formation Classification: ERIW Status: IJ - 5/1/2023 Interval Top: 6410 ft. Interval Bottom: 6705 ft. Completed Information for Formation WEBER | 1st Production Date: | 6/1/1972 | Choke Size: | | Formation Name: | WEBER | Commingled: | No | Production Method: | | Open Hole Completion: | Yes |
| Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 4/26/2023 | Treatment End Date: | 4/26/2023 | Treatment Summary: | PUMPED 640 gallons (15.2 BBLS) of 15% HCL, 260 gallons (6.1 BBLS) CND-600, 104 gallons (2.4 BBLS) Acroline and 290 BBLS Fresh water.
| Total fluid used in treatment (bbls): | 313 | Max pressure during treatment (psi): | 2500 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 23 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 290 | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 11/21/2019 | Treatment End Date: | 11/21/2019 | Treatment Summary: | PUMPED 4000 GALLONS (95.2 BBLS) 15% HCL, 6% CITRIC MUTSOL, 90 BBLS FRESH WATER | Total fluid used in treatment (bbls): | 185 | Max pressure during treatment (psi): | 1200 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 90 | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Type: | ACID JOB | Treatment Date: | 8/14/2014 | Treatment End Date: | 8/14/2014 | Treatment Summary: | PUMP 15% HCL | Total fluid used in treatment (bbls): | 165 | Max pressure during treatment (psi): | 1800 | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | Type Of gas: | | Number Of staged intervals: | | Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | Fresh water used in treatment (bbls): | 70 | Disposition method For flowback: | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | Reason green techniques Not utilized: | Formation Treatment | Treatment Date: | 4/27/2009 | Treatment Summary: | ACID STIMULATION 04/28/09 BULLHEAD 4500 GALLONS OF HEATED 20% HCL THROUGH TUBING @ 3.4 BPM AT 1588 PSI. |
| Tubing Size: | 2.875 in. | Tubing Setting Depth: | 6361 ft. | Tubing Packer Depth: | 6222 ft. | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation WEBR. |
| Perforation Data: | Interval Top: | 6410 ft. | # Of Holes: | | Interval Bottom: | 6705 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 0 |
Total Gas Produced (MCF) | 306459 |
GOR | |
GOR Determination | MCFE |
Average BOE per Day | 143.088 |
Average MCFE per Day | 829.891 |
Federal Financial Assurance | i | Y |
|
|