Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-103-01048
Well Classification: OW Status: PR - 2/1/2011
Well Name/No:A C MCLAUGHLIN #36
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:SCOUT ENERGY MANAGEMENT LLC - 10779
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:47443
Facility Status:PRStatus Date2/1/2011
FacilityID:228130LocationID:314255
County:RIO BLANCO #103Location:NENE 15 2N103W 6
Field:RANGELY - #72370Elevation:5551 ft.
Basin:PICEANCE BASIN  
Planned Location:660FNL  660 FELLat/Long: 40.148398 / -108.935341Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.148545 / -108.935367Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PR - 2/1/2011             Measured TD: 6732 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PR - 2/1/2011
Wellbore Permit
Permit #:471111 Expiration Date:6/1/1947
Proposed Depth/Form:
Surface Mineral Owner Same:Not available
Mineral Owner:FEDERALSurface Owner:Not available
Unit: Unit Number:D-032675
Formation And Spacing:Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit:

Wellbore Completed
Completion Date:N/A
Spud Date:6/29/1947Spud Date Is:ACTUAL
Measured TD:6732 ft.Measured PB depth:6732 ft.
True Vertical TD:True Vertical PB depth:
Log Types:
Casing:String Type: SURF, Hole Size: 16 in., Size: 10.75 in., Top: 0 ft., Depth: 719 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 500, Top: 0 ft., Bottom: 719 ft., Determination Method: CALC
Casing:String Type: 1ST, Hole Size: 10.75 in., Size: 7 in., Top: 0 ft., Depth: 6520 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 0 ft., Bottom: 6520 ft., Determination Method: CALC
Casing:String Type: OPEN HOLE, Hole Size: , Size: 7 in., Top: 6520 ft., Depth: 6732 ft., Weight: , Citings Type: ACTUAL
Cement:Sacks: , Top: , Bottom: , Determination Method:
FormationInterval TopLog BottomCoredDSTs
NIOBRARA2561 ft.3500 ft.NN
FRONTIER3500 ft.3767 ft.NN
MOWRY3767 ft.3851 ft.NN
DAKOTA3851 ft.3942 ft.NN
MORRISON3942 ft.4667 ft.NN
CURTIS4667 ft.4769 ft.NN
ENTRADA4769 ft.4915 ft.NN
CARMEL4915 ft.4973 ft.NN
NAVAJO4973 ft.5598 ft.NN
CHINLE5598 ft.5720 ft.NN
SHINARUMP5720 ft.5780 ft.NN
MOENKOPI5780 ft.6512 ft.NN
WEBER6512 ft.6732 ft.NN

Formation WEBR                     Formation Classification:  OW                     Status:  PR - 2/1/2011                  Interval Top: 6512 ft.

 Completed Information for Formation WEBER
1st Production Date:9/1/1947Choke Size: 
Formation Name:WEBERCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Date:1/16/2006
Treatment Summary:FRACTURE STIMULATE WEBER OPEN HOLE 6520-6732' IN 8 STAGES. STAGE #1 PUMP 5124 GALS SCALE INHIBITOR SQUEEZE @ 8 BPM 1032 PSI. STAGE #2 26,880 GALLONS FRESH WATER SPACER @ 61.4 BPM 3142 PSI. STAGE #3 PUMP 7000 GALLONS YF 130 PAD @ 60.6 BPM 6057 PSI. STAGE #4 PUMP 2000 GALLONS YF130 WITH 2 PPG 20/40 RESIN COATED SAND @ 60 BPM 2825 PSI. STAGE #5 PUMP 3000 GALLONS YF130 WITH 4 PPG 20/40 RESIN COATED SAND @ 60.2 BPM 2860 PSI. STAGE #6 4000 GALLONS YF130 WITH 6 PPG 20/40 RESIN COATED SAND @ 60.1 BPM 2971 PSI. STAGE #7 7500 GALLONS YF130 WITH 8.0 PPG 20/40 RESIN COATED SAND @ 50.2 BPM 2911 PSI. STAGE # 8 UNDER FLUSH TOP OPEN HOLE WITH 130 BBLS WF110 @ 59.BPM 2830 PSI. CLEAN OUT TO PBTD @ 6715. RIH WITH 203 JOINTS USED TK-15 AND ESP
Tubing Size:2.875 in.Tubing Setting Depth:6361 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/29/2006Test Method:TEST VESSEL
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 2586
BBLS_OIL 26
CALC_BBLS_H2O 2586
CALC_BBLS_OIL 26
CALC_GOR 38
CALC_MCF_GAS 1
GRAVITY_OIL 34
MCF_GAS 1
Perforation Data:
Interval Top:# Of Holes:
Interval Bottom:Hole Size:
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
September 2024 - August 2025i
Total Oil Produced (Barrels)9055
Total Gas Produced (MCF)0
GOR
GOR DeterminationBOE
Average BOE per Day26.056
Average MCFE per Day151.129

 Federal Financial Assurance  i Y

 Tribal Well  i No