| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 5/27/2025 | Treatment End Date: | 5/27/2025 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15% HCL W/SOLVENT AND 35 BBLS FRESH WATER |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2200 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 6/21/2024 | Treatment End Date: | 6/21/2024 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bls) 15% HCL w/solvent and 38 bbls water
|
| Total fluid used in treatment (bbls): | 85 | Max pressure during treatment (psi): | 2304 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 38 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/5/2022 | Treatment End Date: | 12/5/2022 |
| Treatment Summary: | Pumped 2000 gallons (47.6 bls) 15% HCL w/solvent and 35 bbls water |
| Total fluid used in treatment (bbls): | 82 | Max pressure during treatment (psi): | 2000 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 35 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/22/2021 | Treatment End Date: | 11/22/2021 |
| Treatment Summary: | Pumped 4000 gallons (95.2 bls) 15% HCL w/solvent and 45 bbls water |
| Total fluid used in treatment (bbls): | 140 | Max pressure during treatment (psi): | 2400 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 45 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 11/6/2019 | Treatment End Date: | 11/6/2019 |
| Treatment Summary: | PUMPED 2000 GALLONS (47.6 BBLS) 15%HCL WITH SOLVENT, 38 BBLS WATER. |
| Total fluid used in treatment (bbls): | 85 | Max pressure during treatment (psi): | 2250 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 38 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 3/26/2018 | Treatment End Date: | 3/26/2018 |
| Treatment Summary: | PUMPED 2000 GALLONS 15% HCL WITH 80 GALLONS OF MUTUAL SOLVENT, 110 BBLS WATER. |
| Total fluid used in treatment (bbls): | 160 | Max pressure during treatment (psi): | 2462 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 47 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 110 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Type: | ACID JOB |
| Treatment Date: | 12/5/2014 | Treatment End Date: | 12/5/2014 |
| Treatment Summary: | PUMPED 4000 GALLONS 15% HCL AT 3.3 BPM |
| Total fluid used in treatment (bbls): | 295 | Max pressure during treatment (psi): | 1700 |
| Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | |
| Type Of gas: | | Number Of staged intervals: | |
| Total acid used in treatment (bbls): | 95 | Min frac gradient (psi/ft): | |
| Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | |
| Fresh water used in treatment (bbls): | 200 | Disposition method For flowback: | |
| Total proppant used (lbs): | | Green completions techniques utilized: | -- |
| Reason green techniques Not utilized: |
| Formation Treatment |
| Treatment Date: | 6/9/2010 |
| Treatment Summary: | ACID STIMULATION 06/09/2010 PUMPED 4000 GALLONS OF 20% HCI THROUGH END OF TUBING 6407T STARTING PRESSURE OF 1870 PSI AT 2.8 BPM. |
| Formation Treatment |
| Treatment Date: | 7/13/2009 |
| Treatment Summary: | (OPEN HOLE 6606 - 6730') ACIDIZE FORMATION W/ 4,000 GALS HEATED 20% HCI, BULLHEAD @ 3.5 BPM @ 1421 PSI. |