|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: ERIW Status: IJ - 2/1/2017 Measured TD: 6472 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW IJ - 2/1/2017 | | Wellbore Permit | | | Permit #: | 100001 | Expiration Date: | 2/24/2000 | | Proposed Depth/Form: | | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEDERAL | Surface Owner: | Not available | | Unit: | | Unit Number: | D-023678 | | Formation And Spacing: | Code: WEBR , Formation: WEBER , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 10/12/2016 | | Spud Date: | 11/2/1947 | Spud Date Is: | ACTUAL | | Measured TD: | 6472 ft. | Measured PB depth: | 6439 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 21 in., Size: 16 in., Top: 0 ft., Depth: 57 ft., Weight: 65 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 75 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 12.75 in., Size: 10.75 in., Top: 0 ft., Depth: 507 ft., Weight: 40.5 , Citings Type: ACTUAL | | Cement: | Sacks: 235, Top: 0 ft., Bottom: 507 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 7 in., Top: 0 ft., Depth: 5843 ft., Weight: 23 , Citings Type: ACTUAL | | Cement: | Sacks: 1000, Top: 0 ft., Bottom: 5843 ft., Determination Method: CBL | | Casing: | String Type: S.C. 1.1, Hole Size: , Size: 7 in., Top: , Depth: , Weight: , Citings Type: ACTUAL | | Cement: | Sacks: 140, Top: 592 ft., Bottom: 608 ft., Determination Method: CALC | | Casing: | String Type: 2ND, Hole Size: 6.125 in., Size: 5.5 in., Top: 0 ft., Depth: 6466 ft., Weight: 17 , Citings Type: ACTUAL | | Cement: | Sacks: 660, Top: 0 ft., Bottom: 6466 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 45 ft., Depth: 202 ft., Bottom: 199 ft., Sacks: 57, Method: SQUEEZE | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WEBER | 5842 ft. | | N | N |
Formation WEBR Formation Classification: ERIW Status: IJ - 2/1/2017 Interval Top: 5852 ft. Interval Bottom: 6434 ft.| Completed Information for Formation WEBER | | 1st Production Date: | 1/1/1964 | Choke Size: | | | Formation Name: | WEBER | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | ACID JOB | | Treatment Date: | 5/13/2016 | Treatment End Date: | 5/13/2016 | | Treatment Summary: | ACID STIMULATION WITH 23.8 BBLS SOLVENT, 24 BBLS 15% HCL AND 126 BBLS FW.
CORRECTED TUBING AND PACKER DEPTH. | | Total fluid used in treatment (bbls): | 174 | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | 24 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | 126 | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 8/21/2009 | | Treatment Summary: | ACID STIMULATION 8/21/09 PUMPED 2000 GALS 20% HCI & 10,500 GALS CLO2 IN FOUR STAGES THROUGH TUBING AT 6000'. AVERAGE 1.2 BPM @ 4541 PSI. |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5587 ft. | | Tubing Packer Depth: | 5548 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | No Initial Test Data was found for formation WEBR. |
| | Perforation Data: | | Interval Top: | 5852 ft. | # Of Holes: | 548 | | Interval Bottom: | 6434 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (UIC) | Y | Defined Inactive 04/30/2023 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | Y |
|
|