Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 This operator is no longer active in the State of Colorado.
 Surface Location
 API# 05-087-08223
Well Classification: OW Status: SI - 9/1/2019
Well Name/No:CLAR #158-24-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PCR OPERATING LLC - 10657
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date9/1/2019
FacilityID:454155LocationID:454154
County:MORGAN #087Location:NENW 24 1N58W 6
Field:ADENA - #700Elevation:4595 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:900FNL  2429 FWLLat/Long: 40.041760 / -103.821400Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.041791 / -103.821424Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: SI - 9/1/2019             Measured TD: 5893 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        SI - 9/1/2019
Wellbore Permit
Permit #: Expiration Date:2/26/2020
Proposed Depth/Form:5900 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: 26-31 , Unit Acreage: 160, Drill Unit: Sec. 24: NW/4
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 400 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 175, Top: 0 ft., Bottom: 400 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5900 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 225, Top: 4200 ft., Bottom: 5900 ft.

Wellbore Completed
Completion Date:4/20/2018
Spud Date:4/15/2018Spud Date Is:ACTUAL
Measured TD:5893 ft.Measured PB depth:5876 ft.
True Vertical TD:True Vertical PB depth:
Log Types:Array induction, Compensated Neutron/Litho Density, Combinable Magnetic Resonance (CMR), Caliper Cement Volume
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 420 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 290, Top: 0 ft., Bottom: 420 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5886 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 4926 ft., Bottom: 5886 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA4781 ft.5228 ft.NN
CARLILE5228 ft.
GREENHORN5289 ft.
BENTONITE5538 ft.
D SAND5632 ft.5662 ft.NN
J SAND5704 ft.5864 ft.NN
SKULL CREEK5864 ft.

Formation J-3                       Formation Classification:  OW                       Status:  TA - 8/27/2018                 Interval Top: 5760 ft.    Interval Bottom: 5791 ft.

 Completed Information for Formation J-3 SAND
1st Production Date:N/AChoke Size: 
Formation Name:J-3 SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:8/24/2018Treatment End Date:8/24/2018
Treatment Summary:Pumped 45 bbls KCL water - break at 1602 psi, Pumped 48 bbls 7.5% HCL/15% Acetic Acid, 184 balls, Pumped 48 bbls flush.
Total fluid used in treatment (bbls):141Max pressure during treatment (psi):2193
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):45Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):
Fresh water used in treatment (bbls):93Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/27/2018Test Method:Swab
Hours Tested:12Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 106
CALC_BBLS_H2O 212
Perforation Data:
Interval Top:5760 ft.# Of Holes:174
Interval Bottom:5791 ft.Hole Size:0.4 in.

Formation JSND                     Formation Classification:  OW                     Status:  SI - 9/1/2019                  Interval Top: 5706 ft.    Interval Bottom: 5748 ft.

 Completed Information for Formation J SAND
1st Production Date:9/10/2018Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:9/10/2018Treatment End Date:9/10/2018
Treatment Summary:Pumped 20 bbls water to break - break @ 2100 psi, Pumped 500 gal 10% acetic - 10% HCL, 120 balls, flush with 2000 gal water.
Total fluid used in treatment (bbls):116Max pressure during treatment (psi):3234
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):286
Fresh water used in treatment (bbls):68Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.875 in.Tubing Setting Depth:5748 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/25/2018Test Method:Rod Pump
Hours Tested:24Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 372
BBLS_OIL 3
CALC_BBLS_H2O 372
CALC_BBLS_OIL 3
GRAVITY_OIL 43
Perforation Data:
Interval Top:5706 ft.# Of Holes:276
Interval Bottom:5748 ft.Hole Size:0.04 in.
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (SI)YLast Production
07/31/2019
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No