Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-087-08178
Well Classification: OW Status: PA - 8/14/2018
Well Name/No:David Bender #1A
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:AURORA POWER RESOURCES INC - 10440
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PAStatus Date8/14/2018
FacilityID:435432LocationID:435430
County:MORGAN #087Location:NWSW 12 4N60W 6
Field:BIJOU WEST - #6730Elevation:4462 ft.
Planned Location:2441FSL  260 FWLLat/Long: 40.326670 / -104.054240Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 40.326670 / -104.054240Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/23/2014
End Date: 4/23/2014
Reported: 5/29/2014
Days to report: 36
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: OW             Status: PA - 8/9/2018             Measured TD: 6585 ft.    Vertical TD: 6419 ft.

 Wellbore Data for Original WellboreWellbore Classification: OW        PA - 8/9/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/12/2015
Prop Depth/Form:6680 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: CODL , Formation: CODELL , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: GRNHN , Formation: GREENHORN , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 500 ft., Weight: 24 , Citings Type: PLANNED
Cement:Sacks: 308, Top: 0 ft., Bottom: 500 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6680 ft., Weight: 15.5 , Citings Type: PLANNED
Cement:Sacks: 320, Top: 4500 ft., Bottom: 6680 ft.

Wellbore Completed
Completion Date:2/17/2014
Spud Date:2/8/2014Spud Date Is:ACTUAL
Measured TD:6585 ft.Measured PB depth:6489 ft.
True Vertical TD:6419 ft.True Vertical PB depth:6322 ft.
Top PZ Location:Sec:12 Twp: 4N 60WFootage: 1381 FSL  611 FWLDepth
Bottom Hole Location:Sec:12 Twp: 4N 60WFootage: 1379 FSL  614 FWLDepth
Log Types:Triple Combo, Micro Log, Mud Log, CBL, CAL, IND, CND
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 538 ft., Weight: 24 , Citings Type: ACTUAL
Cement:Sacks: 292, Top: 0 ft., Bottom: 538 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 6578 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 1750 ft., Bottom: 6578 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA5660 ft.5949 ft.
FORT HAYS5902 ft.5949 ft.
GREENHORN6018 ft.6060 ft.
GRANEROS6170 ft.6200 ft.
X BENTONITE6252 ft.6254 ft.
D SAND6350 ft.6374 ft.
J SAND6426 ft.6552 ft.

Formation JSND                     Formation Classification:  OW                     Status:  AB - 4/9/2014                  Interval Top: 6438 ft.    Interval Bottom: 6463 ft.

 Completed Information for Formation J SAND
1st Production Date:4/3/2014Choke Size: 
Formation Name:J SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/4/2014Treatment End Date:4/4/2014
Treatment Summary:Pumped 36 bbl acid blend (1000 gal 15% HCl+500 gal 10% Acetic acid w/ NE agent, clay stabilizer, surfactant, iron control, inhibitor, & biocide) to "break down" formation. Displaced with 38.6 bbl 3% KCl water.
Total fluid used in treatment (bbls):74Max pressure during treatment (psi):1832
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.74
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):36Min frac gradient (psi/ft):0.75
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):74
Fresh water used in treatment (bbls):38Disposition method For flowback:DISPOSAL
Total proppant used (lbs):Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:4/7/2014Test Method:Swab
Hours Tested:10Gas Type:DRY
Gas Disposal:VENTED
Test TypeMeasure
BBLS_H2O 102
BBLS_OIL 1
CALC_BBLS_H2O 232
CALC_BBLS_OIL 2
GRAVITY_OIL 36
Perforation Data:
Interval Top:6438 ft.# Of Holes:92
Interval Bottom:6463 ft.Hole Size:0.41 in.

Formation DSND                     Formation Classification:  OW                     Status:  AB - 8/14/2018                 Interval Top: 6353 ft.    Interval Bottom: 6369 ft.

 Completed Information for Formation D SAND
1st Production Date:5/2/2014Choke Size: 
Formation Name:D SANDCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:4/10/2014Treatment End Date:4/23/2014
Treatment Summary:Pumped 24 bbl 50% 7-1/2% HCI/10% Acetic acid blend and displaced with 37 bbl 3% KCI water to "break down" formation on 4/10/14. On 4/23/14, hydraulically fractured with 518 bbl 3% KCI water (including displacement) w/23, 750 # 20/40 sand at rates up to 11 BPM, but screened out with sand in tubing (hence high pressure).
Total fluid used in treatment (bbls):579Max pressure during treatment (psi):5031
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.50
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):0.60
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):55
Fresh water used in treatment (bbls):555Disposition method For flowback:DISPOSAL
Total proppant used (lbs):23750Green completions techniques utilized:--
Reason green techniques Not utilized: PIPELINE
Tubing Size:2.875 in.Tubing Setting Depth:6371 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/24/2014Test Method:Pump
Hours Tested:24Gas Type:WET
Gas Disposal:FLARED
Test TypeMeasure
BBLS_H2O 8
BBLS_OIL 3
CALC_BBLS_H2O 8
CALC_BBLS_OIL 3
GRAVITY_OIL 34
Perforation Data:
Interval Top:6353 ft.# Of Holes:64
Interval Bottom:6369 ft.Hole Size:0.41 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
August 2023 - July 2024i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No