|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: PR - 12/1/2020 Measured TD: 5325 ft. Wellbore Data for Original Wellbore | Wellbore Classification: OW PR - 12/1/2020 | Wellbore Permit | | Permit #: | 19890083 | Expiration Date: | 6/9/1989 | Proposed Depth/Form: | 5200 ft. | Surface Mineral Owner Same: | Not available | Mineral Owner: | FEE | Surface Owner: | Not available | Unit: | | Unit Number: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: 40, Drill Unit: |
| | |
Wellbore Completed | Completion Date: | 3/25/1989 | Spud Date: | 1/3/1989 | Spud Date Is: | ACTUAL | Measured TD: | 5325 ft. | Measured PB depth: | 0 ft. | True Vertical TD: | | True Vertical PB depth: | | Log Types: | ATLAS DUAL INDUCTION, NEUTRON DENSITY | Casing: | String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 131 ft., Weight: 24 , Citings Type: ACTUAL | Cement: | Sacks: 130, Top: 0 ft., Bottom: , Determination Method: | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5325 ft., Weight: 14&15.5 , Citings Type: ACTUAL | Cement: | Sacks: 125, Top: 0 ft., Bottom: , Determination Method: | Formation | Interval Top | Log Bottom | Cored | DSTs | NIOBRARA | 4122 ft. | | | | FORT HAYS | 4522 ft. | | | | GREENHORN | 4672 ft. | | | | BENTONITE | 4912 ft. | | | | D SAND | 5002 ft. | | | | J SAND | 5096 ft. | | | |
Formation JSND Formation Classification: OW Status: AB - 1/23/1989 Interval Top: 5096 ft. Completed Information for Formation J SAND | 1st Production Date: | N/A | Choke Size: | | Formation Name: | J SAND | Commingled: | | Production Method: | | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | No Initial Test Data was found for formation JSND. |
| No Perforation Data was found for formation JSND. |
|
Formation DSND Formation Classification: OW Status: PR - 12/1/2020 Interval Top: 5002 ft. Interval Bottom: 5010 ft. Completed Information for Formation D SAND | 1st Production Date: | 3/25/1989 | Choke Size: | 0.000 in. | Formation Name: | D SAND | Commingled: | | Production Method: | PUMPING | Open Hole Completion: | |
| Tubing Size: | | Tubing Setting Depth: | | Tubing Packer Depth: | | Tubing Multiple Packer: | | Open Hole Top: | | Open Hole Bottom: | | Initial Test Data: | Test Date: | 3/25/1989 | Test Method: | PUMPING | Hours Tested: | 24 | Gas Type: | | Gas Disposal: | | |
Test Type | Measure |
---|
BBLS_H2O | 4 | BBLS_OIL | 41 | GRAVITY_OIL | 37 |
| Perforation Data: | Interval Top: | 5002 ft. | # Of Holes: | 32 | Interval Bottom: | 5010 ft. | Hole Size: | |
|
|
|
|
|
Reported Plugged | N | |
Out Of Service Repurposed | N | |
Out Of Service | N | |
Inactive Exception | N | |
Noticed Inactive | N | |
Defined Inactive | N | |
Low Producing | N | |
Total Oil Produced (Barrels) | 1133 |
Total Gas Produced (MCF) | 0 |
GOR | |
GOR Determination | BOE |
Average BOE per Day | 3.100 |
Average MCFE per Day | 17.979 |
Federal Financial Assurance | i | |
|
|