Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 This operator is no longer active in the State of Colorado.
 Surface Location
 API# 05-087-05568
Well Classification: ERIW Status: SI - 1/1/2024
Well Name/No:ADENA J SAND UNIT #W-34
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:PCR OPERATING LLC - 10657
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2024
FacilityID:225170LocationID:313798
County:MORGAN #087Location:NENE 32 2N57W 6
Field:ADENA - #700Elevation:4430 ft.
Basin:DENVER (DJ) BASIN  
Planned Location:990FNL  330 FELLat/Long: 40.098993 / -103.774898Lat/Long Source: Calculated From Footages
As Drilled Location:Footages Not AvailableLat/Long: 40.099275 / -103.775804Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: ERIW             Status: SI - 1/1/2024             Measured TD: 5530 ft.

 Wellbore Data for Original WellboreWellbore Classification: ERIW        SI - 1/1/2024
Wellbore Permit
Permit #:19540000 Expiration Date:1/30/1955
Proposed Depth/Form:5600 ft.
Surface Mineral Owner Same:Not available
Mineral Owner:FEESurface Owner:Not available
Unit:ADENA J SAND UNIT Unit Number: 
Formation And Spacing:Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit:

Wellbore Completed
Completion Date:3/5/1954
Spud Date:2/25/1954Spud Date Is:ACTUAL
Measured TD:5530 ft.Measured PB depth:
True Vertical TD:True Vertical PB depth:
Casing:String Type: SURF, Hole Size: 13.75 in., Size: 10.75 in., Top: , Depth: 103 ft., Weight: 32.75 , Citings Type: ACTUAL
Cement:Sacks: 75, Top: , Bottom: , Determination Method:
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 5519 ft., Weight: 15.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 4270 ft., Bottom: , Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
NIOBRARA4633 ft.
FORT HAYS4984 ft.
GREENHORN5249 ft.
D SAND5437 ft.
J SAND5510 ft.

Formation JSND                     Formation Classification:  ERIW                     Status:  SI - 1/1/2024                  Interval Top: 5511 ft.    Interval Bottom: 5528 ft.

 Completed Information for Formation J SAND
1st Production Date:N/AChoke Size: 
Formation Name:J SANDCommingled:
Production Method:
Open Hole Completion:
Formation Treatment
Treatment Type:ACID JOB
Treatment Date:5/17/2014Treatment End Date:5/17/2014
Treatment Summary:This well was a shut-in injection well in the Adena J Sand Unit. A new CBL was run on 12/14/11. The well was successfully MIT on 1/6/12. The well was reperfed (5511-5528). This well was shut-in waiting on water injection flowline on 12/14/11. The flowline was installed and hooked up on 5/17/14. The well was acidized with 48 bbls 15% HCL on 5/17/14. The well was reactivated as a J Sand injection well on 5/17/14
Total fluid used in treatment (bbls):75Max pressure during treatment (psi):931
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.38
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):48Min frac gradient (psi/ft):0.53
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):75
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_OIL 200
CALC_GOR 450
CASING_PRESS 450
GRAVITY_OIL 44
TUBING_PRESS 200
Perforation Data:
Interval Top:5511 ft.# Of Holes:102
Interval Bottom:5528 ft.Hole Size:
Primary Well Designation:
Defined Inactive      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined Inactive (UIC)YLast Use
04/30/2023
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)0
Total Gas Produced (MCF)0
GOR
GOR Determination 
Average BOE per Day0.000
Average MCFE per Day0.000

 Federal Financial Assurance  i 

 Tribal Well  i No