|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: ERIW Status: SI - 4/1/2020 Measured TD: 5562 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: ERIW SI - 4/1/2020 | | Wellbore Permit | | | Permit #: | 19540000 | Expiration Date: | 1/30/1955 | | Proposed Depth/Form: | 5600 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | ADENA J SAND UNIT | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: , Unit Acreage: , Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 2/10/1954 | | Spud Date: | 2/1/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5562 ft. | Measured PB depth: | | | True Vertical TD: | | True Vertical PB depth: | | | Casing: | String Type: SURF, Hole Size: 13.75 in., Size: 10.75 in., Top: , Depth: 90 ft., Weight: 32.75 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: , Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: , Depth: 5574 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 200, Top: 4240 ft., Bottom: 5574 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4627 ft. | | | | | FORT HAYS | 4978 ft. | | | | | GREENHORN | 5240 ft. | | | | | D SAND | 5424 ft. | | | | | J SAND | 5498 ft. | | | |
Formation JSND Formation Classification: ERIW Status: SI - 4/1/2020 Interval Top: 5500 ft. Interval Bottom: 5518 ft.| Completed Information for Formation J SAND | | 1st Production Date: | N/A | Choke Size: | | | Formation Name: | J SAND | Commingled: | | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 12/14/2011 | | Treatment Summary: | This well was a shut-in injection well in the Adena J Sand Unit. A new CBL was run on 12/6/11. The well was successfully MIT on
12/6/11. The well was reperfed (5500-5518) and acidized with 95 barrels of 15% HCL with liquid KCL, S-1 surfactant, Mavcideii
Biocide. AD-1 injection packer was set at 5450KB. This well was shut-in waiting on water injection flowline on 12/6/11. The flowline was installed and hooked up on 5/18/14. The well was reactivated as a J Sand injection well on 5/18/14.
CBL log attached. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 200 | | CALC_GOR | 450 | | CASING_PRESS | 450 | | GRAVITY_OIL | 44 | | TUBING_PRESS | 200 |
| | Perforation Data: | | Interval Top: | 5500 ft. | # Of Holes: | 108 | | Interval Bottom: | 5518 ft. | Hole Size: | 0.5 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (UIC) | Y | Last Use 03/31/2020 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|