|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 10/1/2021 Measured TD: 5665 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 10/1/2021 | | Wellbore Permit | | | Permit #: | 19540000 | Expiration Date: | 7/4/1954 | | Proposed Depth/Form: | 5800 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | ADENA J SAND UNIT | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: |
| | |
| Wellbore Completed | | Completion Date: | 3/13/1954 | | Spud Date: | 3/4/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5665 ft. | Measured PB depth: | 5649 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | ELECTRICAL | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 108 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: 0 ft., Depth: 5663 ft., Weight: 14,15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4700 ft. | | | | | TIMPAS | 5077 ft. | | | | | CARLILE | 5127 ft. | | | | | GREENHORN | 5183 ft. | | | | | MUDDY D | 5526 ft. | | | | | J SAND | 5591 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 10/1/2021 Interval Top: 5592 ft. Interval Bottom: 5600 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/1/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 2/28/2012 | | Treatment Summary: | Swabbed on existing perfs (5626 to 5642), recovered water. Shot new perfs from 5647 to 5656 with 6 spf, swabbed, recovered water. Set CIBP at 5615 (above all perfs) and then added the new J sand perfs (5592 to 5600) that are currently producing. See attachments for the CIBP wireline report. |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 2/28/2012 | Test Method: | Pumping | | Hours Tested: | 24 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 300 | | BBLS_OIL | 12 | | CALC_BBLS_H2O | 300 | | CALC_BBLS_OIL | 12 | | GRAVITY_OIL | 40 |
| | Perforation Data: | | Interval Top: | 5592 ft. | # Of Holes: | 48 | | Interval Bottom: | 5600 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 09/30/2021 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|