|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 5/1/2021 Measured TD: 5674 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 5/1/2021 | | Wellbore Permit | | | Permit #: | 19540000 | Expiration Date: | 6/15/1954 | | Proposed Depth/Form: | 5800 ft. | | Surface Mineral Owner Same: | Not available | | Mineral Owner: | FEE | Surface Owner: | Not available | | Unit: | ADENA J SAND UNIT | Unit Number: | | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 26-1 , Unit Acreage: 40, Drill Unit: S. 6:SWSW |
| | |
| Wellbore Completed | | Completion Date: | 3/6/1954 | | Spud Date: | 2/24/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5674 ft. | Measured PB depth: | 5641 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | ELECTRICAL | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 107 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: 0 ft., Depth: 5668 ft., Weight: 14,15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4704 ft. | | | | | TIMPAS | 5083 ft. | | | | | GREENHORN | 5190 ft. | | | | | MUDDY D | 5524 ft. | | | | | J SAND | 5594 ft. | | | |
Formation JSND Formation Classification: OW Status: SI - 5/1/2021 Interval Top: 5597 ft. Interval Bottom: 5635 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/11/1954 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 3/8/2014 | Treatment End Date: | N/A | | Treatment Summary: | No treatment required. Reactivated this SI J Sand well from the original perforations. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5478 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 3/8/2014 | Test Method: | Pump | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 990 | | BBLS_OIL | 10 | | BTU_GAS | 1200 | | CALC_BBLS_H2O | 990 | | CALC_BBLS_OIL | 10 | | CASING_PRESS | 335 | | GRAVITY_OIL | 42 | | TUBING_PRESS | 220 |
| | Perforation Data: | | Interval Top: | 5597 ft. | # Of Holes: | 152 | | Interval Bottom: | 5635 ft. | Hole Size: | |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 04/30/2021 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|