|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 4/1/2020 Measured TD: 5576 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 4/1/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 11/26/2013 | | Proposed Depth/Form: | 5576 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 26 , Unit Acreage: 40, Drill Unit: SWSE | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 126 ft., Weight: 24 , Citings Type: PLANNED | | Cement: | Sacks: 100, Top: , Bottom: 126 ft. | | Casing: | String Type: 1ST, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 5576 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: , Bottom: 5576 ft. |
| | |
| Wellbore Completed | | Completion Date: | 1/22/1954 | | Spud Date: | 1/8/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5576 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | ELECTRICAL | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 126 ft., Weight: 24 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: 0 ft., Depth: 5576 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 50, Top: 0 ft., Bottom: , Determination Method: |
Formation JSND Formation Classification: OW Status: SI - 4/1/2020 Interval Top: 5548 ft. Interval Bottom: 5556 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/1/2012 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | | | Treatment Date: | 1/19/2013 | Treatment End Date: | N/A | | Treatment Summary: | Set a Composite BP at 5557' partially isolate existing perforations (5550 to 5570'); then perforated from 5548 to 5556'. CBP ticket is attached. | | Total fluid used in treatment (bbls): | | Max pressure during treatment (psi): | | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5540 ft. | | Tubing Packer Depth: | 5510 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 1/19/2013 | Test Method: | swabbing | | Hours Tested: | 8 | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_H2O | 114 | | BBLS_OIL | 5 | | CALC_BBLS_H2O | 342 | | CALC_BBLS_OIL | 15 | | CALC_GOR | 600 | | CASING_PRESS | 1300 | | GRAVITY_OIL | 42 | | MCF_GAS | 600 | | TUBING_PRESS | 400 |
| | Perforation Data: | | Interval Top: | 5548 ft. | # Of Holes: | 48 | | Interval Bottom: | 5556 ft. | Hole Size: | 0.42 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 03/31/2020 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|