|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: OW Status: SI - 12/1/2020 Measured TD: 5620 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 12/1/2020 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 8/15/2012 | | Proposed Depth/Form: | 5620 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | ADENA "J" SAND | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: 26 , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: , Depth: 107 ft., Weight: 28 , Citings Type: PLANNED | | Cement: | Sacks: 85, Top: 0 ft., Bottom: 107 ft. | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: , Depth: 5620 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: , Bottom: 5620 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/27/1954 | | Spud Date: | 3/6/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5620 ft. | Measured PB depth: | 0 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | ELECTRICAL & MICRO | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 107 ft., Weight: 28 , Citings Type: ACTUAL | | Cement: | Sacks: 85, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: 0 ft., Depth: 5620 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 275, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4645 ft. | | N | | | CARLILE | 5074 ft. | | N | | | D SAND | 5462 ft. | | N | | | J SAND | 5529 ft. | | Y | |
Formation JSND Formation Classification: OW Status: TA - 7/11/2011 Interval Top: 5557 ft. Interval Bottom: 5561 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/27/1954 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 9/22/2010 | | Treatment Summary: | SET CIBP @ 5,520'-DUMP 1 SK CEMENT ON CIBP |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 136 | | CALC_GOR | 4860 | | CASING_PRESS | 1000 | | GRAVITY_OIL | 42 | | TUBING_PRESS | 974 |
| | Perforation Data: | | Interval Top: | 5557 ft. | # Of Holes: | 24 | | Interval Bottom: | 5561 ft. | Hole Size: | |
|
Formation DSND Formation Classification: OW Status: SI - 12/1/2020 Interval Top: 5472 ft. Interval Bottom: 5490 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 5/14/2012 | Choke Size: | | | Formation Name: | D SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Date: | 5/9/2012 | | Treatment Summary: | 1 stage: Fracture stimulated the existing completion with 420 bbls of cross-linked gel, 14,000# of 20/40 sand and 2,980# of 16/30 Interprop. | | Formation Treatment | | Treatment Date: | 9/22/2010 | | Treatment Summary: | PERFORATED ONLY |
| | Tubing Size: | 2.875 in. | Tubing Setting Depth: | 5445 ft. | | Tubing Packer Depth: | 5445 ft. | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 5/16/2012 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 30 | | BBLS_OIL | 30 | | BTU_GAS | 1150 | | CALC_BBLS_H2O | 30 | | CALC_BBLS_OIL | 30 | | CALC_GOR | 9200 | | CALC_MCF_GAS | 275 | | GRAVITY_OIL | 40 | | MCF_GAS | 275 | | TUBING_PRESS | 375 |
| | Perforation Data: | | Interval Top: | 5472 ft. | # Of Holes: | 90 | | Interval Bottom: | 5490 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 11/30/2020 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|