Wellbore #00 Wellbore Classification: OW Status: SI - 7/1/2024 Measured TD: 5619 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: OW SI - 7/1/2024 | | Wellbore Permit | | | Permit #: | | Expiration Date: | 3/11/2011 | | Proposed Depth/Form: | 5619 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: DSND , Formation: D SAND , Order: , Unit Acreage: , Drill Unit: | | Formation And Spacing: | Code: JSND , Formation: J SAND , Order: 0 , Unit Acreage: 0, Drill Unit: | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: , Depth: 109 ft., Weight: 24,32 , Citings Type: PLANNED | | Cement: | Sacks: 75, Top: 0 ft., Bottom: 109 ft. | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: , Depth: 5616 ft., Weight: 15.5 , Citings Type: PLANNED | | Cement: | Sacks: 225, Top: 2 ft., Bottom: 5616 ft. |
| | |
| Wellbore Completed | | Completion Date: | 2/28/1954 | | Spud Date: | 2/20/1954 | Spud Date Is: | ACTUAL | | Measured TD: | 5619 ft. | Measured PB depth: | 5607 ft. | | True Vertical TD: | | True Vertical PB depth: | | | Log Types: | ELECTRICAL | | Casing: | String Type: SURF, Hole Size: , Size: 8.625 in., Top: 0 ft., Depth: 109 ft., Weight: 24,32 , Citings Type: ACTUAL | | Cement: | Sacks: 75, Top: 0 ft., Bottom: , Determination Method: | | Casing: | String Type: 1ST, Hole Size: , Size: 5.5 in., Top: 0 ft., Depth: 5616 ft., Weight: 15.5 , Citings Type: ACTUAL | | Cement: | Sacks: 225, Top: 0 ft., Bottom: , Determination Method: | | Formation | Interval Top | Log Bottom | Cored | DSTs | | NIOBRARA | 4677 ft. | | | | | TIMPAS | 5058 ft. | | | | | CARLILE | 5108 ft. | | | | | GREENHORN | 5168 ft. | | | | | MUDDY D | 5504 ft. | | | | | J SAND | 5568 ft. | | | |
Formation JSND Formation Classification: OG Status: TA - 4/7/2011 Interval Top: 5584 ft. Interval Bottom: 5602 ft.| Completed Information for Formation J SAND | | 1st Production Date: | 3/7/1954 | Choke Size: | | | Formation Name: | J SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | |
| | Formation Treatment | | Treatment Date: | 4/14/2010 | | Treatment Summary: | SET CIBP @ 5565' - DUMP 1 SK CEMENT ON CIBP |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 422 | | CASING_PRESS | 380 | | GRAVITY_OIL | 43.9 | | TUBING_PRESS | 160 |
| | Perforation Data: | | Interval Top: | 5584 ft. | # Of Holes: | 72 | | Interval Bottom: | 5602 ft. | Hole Size: | |
|
Formation DSND Formation Classification: OW Status: SI - 3/1/2020 Interval Top: 5512 ft. Interval Bottom: 5524 ft.| Completed Information for Formation D SAND | | 1st Production Date: | 4/30/2010 | Choke Size: | | | Formation Name: | D SAND | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 5/28/2013 | Treatment End Date: | 5/28/2013 | | Treatment Summary: | Move in rig up Basic Energy services to frac d-sand from 5512 to 5524 with cross linked gelled water
Safety meeting
prime up and pressure test to 6000 psi
Load 2 7/8 X 5 1/2 csg with 30 brls 2 % kcl water
vented annulas to the swab tank during the frac. Pkr held solid
Pumped 17,020 # 20/40 ottowa sand and 3,400 # interprop 18/40 sand
Break down at 3050
ISIP @ 2025, 5-MIN @ 1271, 10-MIN @ 304, 12-MIN ON VAC
MAX INJ RATE @ 12.2, AVG INJ RATE @ 11.6,
MAX PSI @ 3583, AVG INJ RATE @ 2729
466 BRLS OF LOAD WATER TO RECOVER
LEFT WELL SHUT IN OVER NIGHT
PREPARE TO SWAB WELL BACK IN THE AM | | Total fluid used in treatment (bbls): | 466 | Max pressure during treatment (psi): | 3583 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | 1 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | 0 | Total flowback volume recovered (bbls): | 466 | | Fresh water used in treatment (bbls): | 466 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 20420 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: | | Formation Treatment | | Treatment Date: | 4/14/2010 | | Treatment Summary: | PERFORATED ONLY |
| | Tubing Size: | | Tubing Setting Depth: | | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BBLS_OIL | 54 | | CALC_BBLS_OIL | 54 | | GRAVITY_OIL | 39 |
| | Perforation Data: | | Interval Top: | 5512 ft. | # Of Holes: | 40 | | Interval Bottom: | 5524 ft. | Hole Size: | 0.41 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive (SI) | Y | Last Production 12/31/2019 |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 0 |
| Total Gas Produced (MCF) | 0 |
| GOR | |
| GOR Determination | |
| Average BOE per Day | 0.000 |
| Average MCFE per Day | 0.000 |
| Federal Financial Assurance | i | |
|
|